Do you have any question about this error?
Message type: E = Error
Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.
Message number: 295
Message text: Operation is already deleted
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL295
- Operation is already deleted ?The SAP error message CPCL295, which states "Operation is already deleted," typically occurs in the context of production planning or project management within SAP. This error indicates that an operation you are trying to access or modify has already been deleted from the system, and therefore, any attempt to perform actions on it will result in this error.
Causes:
- Manual Deletion: The operation may have been manually deleted by a user or through a batch job.
- Data Consistency Issues: There may be inconsistencies in the database, possibly due to incomplete transactions or errors during data processing.
- Workflow Changes: Changes in the workflow or project structure may lead to the deletion of operations that are no longer relevant.
- System Updates: Updates or changes in the system configuration might have led to the removal of certain operations.
Solutions:
- Check Operation Status: Verify the status of the operation in the relevant transaction (e.g., CO02 for production orders, CJ20N for project management). Ensure that the operation is indeed deleted.
- Refresh Data: Sometimes, refreshing the data or reloading the transaction can resolve temporary inconsistencies.
- Review Change Logs: Check the change logs or audit trails to see if the operation was deleted and by whom. This can provide insights into whether it was an intentional action.
- Recreate the Operation: If the operation is essential, you may need to recreate it if it was deleted unintentionally.
- Consult Documentation: Review SAP documentation or notes related to the specific module you are working with for any known issues or patches.
- Contact Support: If the issue persists and you cannot determine the cause, consider reaching out to SAP support for assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the CPCL295 error in SAP.
Get instant SAP help. Start your 7-day free trial now.
CPCL294
The reference point & for the BOM transfer does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL293
The summarization type & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL296
Relevancy to costing indicator & does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL297
Inconsistent component assignment resulting from assigning oper. to seq.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.