SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.

  • Message number: 239

  • Message text: The reference date for start of suboperation & is not scheduled

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CPCL239 - The reference date for start of suboperation & is not scheduled ?

    The SAP error message CPCL239 indicates that there is an issue with the scheduling of a suboperation in a production order or process order. Specifically, it means that the reference date for the start of the suboperation is not scheduled, which can lead to problems in the production planning and execution processes.

    Cause:

    1. Missing Scheduling Information: The suboperation may not have been scheduled properly, which can occur if the preceding operations are not completed or if there are gaps in the scheduling logic.
    2. Incorrect Dates: The reference date for the suboperation might be set incorrectly, leading to a situation where the system cannot find a valid start date.
    3. Dependencies Not Met: If the suboperation depends on the completion of other operations or tasks that have not been finished, it may not have a valid start date.
    4. Configuration Issues: There may be issues with the configuration of the routing or the production order that prevent proper scheduling.

    Solution:

    1. Check Scheduling: Review the scheduling of the production order and ensure that all preceding operations are completed and scheduled correctly.
    2. Adjust Dates: If the reference date is incorrect, adjust it to a valid date that aligns with the overall production schedule.
    3. Review Dependencies: Ensure that all dependencies for the suboperation are met. If there are preceding operations that need to be completed first, make sure they are scheduled and executed.
    4. Re-schedule the Order: Use the scheduling functions in SAP to re-schedule the production order or the specific suboperation. This can often resolve issues related to scheduling.
    5. Check Configuration: If the problem persists, review the configuration settings for the routing and production order to ensure they are set up correctly.

    Related Information:

    • Transaction Codes: You may use transaction codes like CO02 (Change Production Order) or CO03 (Display Production Order) to check the details of the production order and its operations.
    • Production Planning (PP) Module: Familiarity with the PP module in SAP can help in understanding how operations and scheduling work.
    • SAP Notes: Check for any relevant SAP Notes or documentation that may address specific issues related to this error message.
    • User Exits and BAdIs: If custom logic is implemented in your SAP system, check for any user exits or BAdIs that might affect scheduling.

    If the issue continues after trying the above solutions, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in the PP module for further assistance.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant