Message type: E = Error
Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.
Message number: 229
Message text: Operation instead of suboperation
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CPCL229
- Operation instead of suboperation ?The SAP error message CPCL229 ("Operation instead of suboperation") typically occurs in the context of production planning and control, particularly when dealing with routing and work center operations in SAP. This error indicates that the system is expecting a suboperation but has encountered an operation instead.
Cause:
- Routing Configuration: The routing for a particular production order may be incorrectly set up. The system expects a suboperation (which is a more detailed breakdown of an operation) but finds an operation instead.
- Incorrect Assignment: The operation might be incorrectly assigned in the routing or the production order, leading to a mismatch.
- Data Inconsistency: There may be inconsistencies in the master data related to the routing or work center.
Solution:
- Check Routing: Review the routing for the production order. Ensure that the operations and suboperations are correctly defined. If an operation is defined where a suboperation is expected, you may need to adjust the routing.
- Adjust Production Order: If the production order is incorrectly referencing an operation instead of a suboperation, you may need to modify the order to align with the routing.
- Review Work Center Settings: Ensure that the work center settings are correctly configured to handle operations and suboperations as intended.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on routing and operations/suboperations.
- Testing: After making changes, test the routing and production order to ensure that the error does not recur.
Related Information:
CA03
(Display Routing) or CO02
(Change Production Order) to review and modify routing and production orders.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CPCL228
Suboperation is not unique
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CPCL226
Operation dependencies cannot be updated
What causes this issue? You have assigned dependencies to an operation or changed existing dependencies.System Response The object dependencies were...
CPCL230
Task list type & does not allow references to routings
What causes this issue? You want to create a reference to a reference operation set or reference rate routing. However, the task list type of the rou...
CPCL231
Suboperation instead of operation
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.