Do you have any question about this error?
Message type: E = Error
Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.
Message number: 219
Message text: Operation &1 is not locked
You cannot create the objects.
Go to the <zh>Operations</> overview.
Select operation &V1&.
Choose <LS>Operation -> Change/Lock</>.
Go back to the overview of the objects you want to create.
Create the objects.
Error message extract from SAP system. Copyright SAP SE.
CPCL219
- Operation &1 is not locked ?The SAP error message CPCL219, which states "Operation &1 is not locked," typically occurs in the context of production planning and control (PP) or project system (PS) modules. This error indicates that the system is trying to perform an operation on a production order or a project that is not currently locked, which can lead to inconsistencies or conflicts in data processing.
Cause:
- Concurrency Issues: The operation may be attempted by multiple users or processes simultaneously, leading to a situation where the system cannot lock the operation for the current user.
- System Configuration: The locking mechanism may not be properly configured in the system settings.
- User Authorization: The user may not have the necessary authorizations to lock the operation.
- Technical Issues: There may be underlying technical issues or bugs in the SAP system that prevent the locking mechanism from functioning correctly.
Solution:
- Check Lock Status: Verify if the operation is indeed locked by another user or process. You can use transaction code SM12 to check for existing locks.
- Retry the Operation: Sometimes, simply retrying the operation after a short wait can resolve the issue if it was a temporary concurrency problem.
- User Authorization: Ensure that the user has the necessary authorizations to perform the operation. Check the user roles and permissions.
- System Configuration: Review the configuration settings related to locking mechanisms in the SAP system. Consult with your SAP Basis or system administrator if necessary.
- Transaction Logs: Check transaction logs for any errors or warnings that might provide additional context about the issue.
- SAP Notes: Search for relevant SAP Notes in the SAP Support Portal that may address this specific error message or provide patches or updates.
- Contact SAP Support: If the issue persists and cannot be resolved through the above steps, consider reaching out to SAP Support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the CPCL219 error effectively.
Get instant SAP help. Start your 7-day free trial now.
CPCL218
Operation cannot be locked (lock management error)
INCLUDE NA_OBJ_ANLSPERRV OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
CPCL217
Operation invalid on key date
INCLUDE NA_OBJ_STICHUN OBJECT DOKU ID TXError message extract from SAP system. Copyright SAP SE. ...
CPCL220
Operation cannot be determined, due to lack of identifying data
What causes this issue? INCLUDE EWB_TXT_INTERNAL_ERROR1 OBJECT DOKU ID TX The system tried to determine the data in an operation. However, not all th...
CPCL221
Reduction strategy does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.