Message type: E = Error
Message class: CPCL - Service Layer for Plans, Sequences, Operations, and Subober.
Message number: 215
Message text: Standard value cumulation not allowed in operation &1
You want to cumulate the standard values for an operation. However, the
cumulation indicator for the operation does not allow cumulation.
The standard values are not cumulated.
Set the cumulation indicator so it allows cumulation. Then you can
cumulate the standard values for the operation.
Error message extract from SAP system. Copyright SAP SE.
CPCL215
- Standard value cumulation not allowed in operation &1 ?The SAP error message CPCL215, which states "Standard value cumulation not allowed in operation &1," typically occurs in the context of production planning and control, particularly when dealing with work centers and operations in routing.
Cause:
This error message is triggered when there is an attempt to cumulate standard values for an operation that does not allow it. Standard value cumulation is a feature in SAP that allows the system to aggregate standard times for operations, but certain conditions or configurations may prevent this from happening. Common causes include:
- Operation Type: The operation type may not support standard value cumulation.
- Routing Configuration: The routing may be incorrectly configured, or the operation may not be set up to allow cumulation.
- Work Center Settings: The work center associated with the operation may have settings that do not permit cumulation of standard values.
- Missing Parameters: Required parameters for cumulation may be missing or incorrectly defined in the operation or work center.
Solution:
To resolve the CPCL215 error, you can take the following steps:
Check Operation Type: Verify that the operation type you are using supports standard value cumulation. You can do this by checking the operation type configuration in the system.
Review Routing: Examine the routing for the affected operation. Ensure that the operation is correctly defined and that all necessary parameters for cumulation are set.
Inspect Work Center Settings: Go to the work center configuration and check if the settings allow for standard value cumulation. You may need to adjust the settings to enable this feature.
Adjust Standard Values: If cumulation is not necessary for the operation, consider adjusting the standard values to avoid the need for cumulation.
Consult Documentation: Refer to SAP documentation or help resources for specific guidance on the operation type and work center settings related to standard value cumulation.
Testing: After making changes, test the routing and operations to ensure that the error no longer occurs.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), or CR01
(Create Work Center) to access and modify the relevant configurations.If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CPCL214
You must enter a key date, to cumulate standard values
What causes this issue? You want to cumulate standard values. However you have not entered a key date.System Response The standard values are not cu...
CPCL213
Operation is invalid
What causes this issue? You want to create an object (for examlple, PRT) on a key date. However, the operation that you want to assign to the object ...
CPCL216
Standard value cumulation in operation &1 only allowed in the order
What causes this issue? You want to cumulate the standard values for an operation. However, the cumulation indicator for the operation does not allow...