How To Fix CPCC_DM034 - Changing of suboperation &1/&2 of sequence &3


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CPCC_DM - Message Class for Changing Task List

  • Message number: 034

  • Message text: Changing of suboperation &1/&2 of sequence &3

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CPCC_DM034 - Changing of suboperation &1/&2 of sequence &3 ?

    The SAP error message CPCC_DM034 typically occurs in the context of production planning and control, particularly when dealing with operations and sequences in a production order or routing. This error indicates that there is an issue with changing a sub-operation within a sequence in the production process.

    Cause:

    The error message CPCC_DM034 can be triggered by several factors, including:

    1. Invalid Operation Sequence: The sub-operation you are trying to change may not be valid within the context of the specified sequence.
    2. Locked Operations: The operation or sequence may be locked by another user or process, preventing changes.
    3. Dependencies: There may be dependencies or constraints that prevent the modification of the sub-operation.
    4. Configuration Issues: There could be issues with the configuration of the routing or production order that are causing the error.

    Solution:

    To resolve the CPCC_DM034 error, you can take the following steps:

    1. Check Operation Validity: Ensure that the sub-operation you are trying to change is valid for the specified sequence. Review the routing and confirm that the operation exists and is correctly defined.

    2. Unlock the Operation: If the operation is locked, check if another user is currently editing it. You may need to wait for them to finish or coordinate with them to unlock the operation.

    3. Review Dependencies: Look for any dependencies or constraints that might be preventing the change. This could include checking for linked operations or prerequisites that must be fulfilled before making changes.

    4. Configuration Review: Verify the configuration of the routing and production order. Ensure that all settings are correct and that there are no inconsistencies.

    5. Consult Documentation: Refer to SAP documentation or help resources for specific guidance related to the error message. This can provide additional context and troubleshooting steps.

    6. Contact Support: If the issue persists after trying the above steps, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CO02 (Change Production Order) or CA02 (Change Routing) that may be involved in the process.
    • SAP Notes: Check for any SAP Notes related to this error message, as they may provide patches or additional solutions.
    • User Authorization: Ensure that you have the necessary authorizations to make changes to the operations and sequences in the production order.

    By following these steps, you should be able to identify the cause of the CPCC_DM034 error and implement a suitable solution.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker