Do you have any question about this error?
Message type: E = Error
Message class: CP_ES_TASK_MAINT - Maintenance task list: message class
Message number: 038
Message text: Creation of referenced operation &1 from sequence &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP_ES_TASK_MAINT038
- Creation of referenced operation &1 from sequence &2 ?The SAP error message CP_ES_TASK_MAINT038 typically occurs in the context of SAP's Production Planning (PP) or Project System (PS) modules, particularly when dealing with operations in a routing or task sequence. The message indicates that there was an issue creating a referenced operation from a sequence.
Cause:
The error can be caused by several factors, including:
- Missing Master Data: The operation or sequence you are trying to reference may not exist or may not be properly defined in the system.
- Incorrect Configuration: There may be configuration issues in the routing or task sequence that prevent the operation from being created.
- Authorization Issues: The user may not have the necessary permissions to create or modify operations in the specified sequence.
- Data Inconsistencies: There may be inconsistencies in the data related to the operation or sequence, such as invalid or incomplete entries.
Solution:
To resolve the error, you can take the following steps:
- Check Master Data: Verify that the operation and sequence you are trying to reference exist in the system and are correctly defined. Ensure that all required fields are filled out.
- Review Configuration: Check the configuration settings for the routing or task sequence. Ensure that all necessary settings are in place and that there are no missing links.
- User Authorizations: Ensure that the user has the necessary authorizations to create or modify operations. You may need to consult with your SAP security team to verify this.
- Data Validation: Review the data for any inconsistencies or errors. Correct any issues found in the operation or sequence data.
- Transaction Logs: Check transaction logs or system logs for additional error messages or warnings that may provide more context about the issue.
- SAP Notes: Search for relevant SAP Notes or documentation that may address this specific error message. SAP frequently updates its knowledge base with solutions for common issues.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), or CJ20N
(Project Builder) depending on the context of the error.If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a technical consultant who can provide more in-depth analysis and assistance.
Get instant SAP help. Start your 7-day free trial now.
CP_ES_TASK_MAINT037
Deletion of long text for suboperation &1/&2 from sequence &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP_ES_TASK_MAINT036
Creation of long text for suboperation &1/&2 from sequence &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP_ES_TASK_MAINT039
Deletion of referenced operation &1 from sequence &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP_ES_TASK_MAINT040
Creation of PRT no. &1 from operation &2, sequence &3
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.