Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 818
Message text: Planner group &2 does not exist in plant &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP818
- Planner group &2 does not exist in plant &1 ?The SAP error message CP818 indicates that the planner group specified in a transaction does not exist for the specified plant. This error typically occurs in the context of production planning and control (PP) when trying to execute a function that requires a valid planner group.
Cause:
- Non-Existent Planner Group: The planner group you are trying to use has not been defined in the system for the specified plant.
- Incorrect Configuration: The planner group may have been deleted or not properly configured in the system.
- Data Entry Error: There may be a typo or incorrect entry in the planner group field.
Solution:
Check Planner Group Configuration:
- Go to the transaction code
SPRO
to access the SAP Customizing Implementation Guide.- Navigate to Production ? Basic Data ? Planner Groups.
- Verify if the planner group exists for the specified plant. If it does not exist, you may need to create it.
Create or Modify Planner Group:
- If the planner group is missing, you can create a new planner group by using the transaction code
PP01
(or through the customizing path mentioned above).- Ensure that the planner group is assigned to the correct plant.
Check for Typos:
- Double-check the input for the planner group in the transaction where the error occurred. Ensure that there are no typographical errors.
Authorization Check:
- Ensure that you have the necessary authorizations to view or modify planner groups in the system.
Consult Documentation:
- If you are unsure about the correct planner group to use, consult your organization's documentation or reach out to your SAP PP consultant for guidance.
Related Information:
SPRO
for configuration.PP01
for maintaining planner groups.By following these steps, you should be able to resolve the CP818 error and ensure that the correct planner group is used in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CP817
No scheduling type exists that allows forward scheduling
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP816
Material & is being updated
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP819
Choose the same plant &1 as for the selection of PI categories
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP821
Routing & & is not always valid in the lot size interval.
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.