How To Fix CP663 - You have reached the first selected reference rate routing.


CP663 - Overview

  • Message type: E = Error

  • Message class: CP - Task list messages: Core data

  • Message number: 663

  • Message text: You have reached the first selected reference rate routing.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CP663 - You have reached the first selected reference rate routing. ?
    The SAP error message CP663 ("You have reached the first selected reference rate routing.") typically occurs in the context of the SAP Controlling (CO) module, particularly when dealing with cost planning or cost center accounting. This error indicates that the system has reached the first reference rate routing in a planning scenario, but it may not be able to proceed further due to certain conditions not being met.
    
    Cause: Routing Configuration: The routing for the cost center or activity type may not be properly configured. This could include missing or incorrect settings in the routing or the reference rate. Data Inconsistencies: There may be inconsistencies in the data related to the cost center, activity type, or the reference rate that is being used. Planning Version: The planning version being used may not be set up correctly or may not have the necessary data. Authorization Issues: The user may not have the necessary authorizations to access

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author