Message text: No. of splits is greater than individual capacities in work center
You have entered a number of splits that is greater than the number of
individual capacities available at the work center. In this case, the
system uses the smaller of the two values to calculate, which means it
uses the number of individual capacities at the work center.
Error message extract from SAP system. Copyright SAP SE.
CP535
- No. of splits is greater than individual capacities in work center ?The SAP error message CP535 ("No. of splits is greater than individual capacities in work center") typically occurs in the context of production planning and scheduling when the system attempts to split a production order or operation into more components than the available capacity of the work center can handle. This can happen during the scheduling of operations in the production process.
Cause:
- Capacity Constraints: The work center has a defined capacity that is being exceeded by the number of splits being requested for a particular operation.
- Incorrect Configuration: The configuration of the work center may not accurately reflect its actual capacity or the number of available resources.
- Production Order Settings: The production order may have been set up in a way that requires more splits than the work center can accommodate.
- Scheduling Parameters: The scheduling parameters for the operation may be set incorrectly, leading to an unrealistic number of splits.
Solution:
Review Work Center Capacity:
- Check the capacity settings of the work center in transaction code
CR02
(Change Work Center).- Ensure that the available capacity is sufficient for the planned production.
Adjust Production Order:
- Review the production order and its settings. You can do this in transaction code
CO02
(Change Production Order).- Adjust the number of splits or the quantities being produced to align with the work center's capacity.
Modify Scheduling Parameters:
- Check the scheduling parameters for the operation in the routing. Ensure that they are set correctly to avoid excessive splitting.
- You can access the routing in transaction code
CA02
(Change Routing).Capacity Planning:
- If necessary, consider adjusting the capacity planning settings to better reflect the actual capabilities of the work center.
- This may involve increasing the capacity or redistributing workloads among different work centers.
Consult Documentation:
- Review SAP documentation or consult with your SAP support team for specific guidelines related to your version of SAP and the configuration of your system.
Related Information:
CR02
: Change Work CenterCO02
: Change Production OrderCA02
: Change RoutingBy following these steps, you should be able to resolve the CP535 error and ensure that your production scheduling aligns with the available capacities of your work centers.
Get instant SAP help. Start your 7-day free trial now.
CP534
No. of splits is greater than individual capacities in work center
What causes this issue? You have entered a number of splits that is greater than the number of individual capacities available at the work center. In...
CP526
Sub-operation: date &: sub-operation number & not unique
What causes this issue? The sub-operation number is not unique. A <GL:routing>routing</>/<GL:inspection_plan>plan</> can onl...
CP536
No. of splits is greater than individual capacities in work center
What causes this issue? You have entered a number of splits that is greater than the number of individual capacities available at the work center. In...
CP540
============ Input facility =====================================
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.