Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 497
Message text: Unit for standard value &1 in operation &2 taken from sub-operation
The standard value &V1& of the cumulation function &V2& does not have
an unit.
The system uses the unit of the standard value from the first
suboperation for which you have entetered a standard value unit.
Enter an unit for the standard value of the cumulation function in the
routing.
Error message extract from SAP system. Copyright SAP SE.
CP497
- Unit for standard value &1 in operation &2 taken from sub-operation ?The SAP error message CP497 indicates that there is an issue with the unit of measure (UoM) for a standard value in a specific operation that is being taken from a sub-operation. This typically occurs in the context of production planning and control, particularly when dealing with routing and work center data.
Cause:
- Mismatch in Units of Measure: The standard value defined for the operation is in a different unit of measure than what is expected or defined in the sub-operation.
- Configuration Issues: There may be inconsistencies in the configuration of the routing or work center, where the units of measure are not aligned.
- Data Entry Errors: Incorrect data entry when defining the standard values or operations can lead to this error.
- Inconsistent Master Data: The master data for materials, operations, or work centers may not be consistent, leading to discrepancies in units of measure.
Solution:
- Check Routing and Operations: Review the routing for the affected operation and sub-operation. Ensure that the units of measure for standard values are consistent across both.
- Adjust Standard Values: If the standard value is incorrectly defined, update it to match the expected unit of measure.
- Review Work Center Settings: Check the work center settings to ensure that the units of measure are correctly defined and consistent with the routing.
- Correct Master Data: Ensure that all related master data (materials, operations, work centers) is consistent and correctly configured.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on handling unit of measure issues in your version of SAP.
Related Information:
CA01
(Create Routing), CA02
(Change Routing), or CR01
(Create Work Center) to make necessary adjustments.If the issue persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CP496
Sub-oper. &1 for cumulation oper. &2 contains additional standard values
What causes this issue? You want to cumulate the standard values from the sub-operations of operation &V2&. The work center, at which the sub...
CP495
There are no operations in the current overview
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP498
No valid work center for operation &1 in reference operation set
What causes this issue? You want to cumulate the standard values from operations of a reference operation set in the work center operation set &v...
CP499
Unsuitable standard value parameter in operation &1 of the ref. op. set
What causes this issue? You want to cumulate the standard values from operations of a reference operation set in the work center operation set &v...
Click on this link to search all SAP messages.