Do you have any question about this error?
Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 439
Message text: Incorrect lot size range for alternative sequence
A reference operation set is referenced in routing &V1& &V2&, operation
&V4& and sequence &V3&. The lot size range of the alternative sequence
exceeds the lot size range of the referenced operation set.
Check the routing and, if necessary, correct the lot size range of the
alternative sequence.
Make sure that the lot size range of the referenced operation set
includes the lot size range of the referenced sequence.
Error message extract from SAP system. Copyright SAP SE.
CP439
- Incorrect lot size range for alternative sequence ?The SAP error message CP439, which states "Incorrect lot size range for alternative sequence," typically occurs in the context of production planning and control, particularly when dealing with alternative sequences in the production process. This error indicates that there is a mismatch or inconsistency in the lot size range defined for an alternative sequence in the routing or production order.
Cause:
- Lot Size Configuration: The lot size range defined for the alternative sequence does not match the lot size defined in the production order or the master data.
- Routing Issues: The routing for the production order may not have the correct alternative sequences defined, or the sequences may not be properly configured.
- Master Data Inconsistencies: There may be inconsistencies in the material master data, such as the lot size range not being properly set for the material being produced.
- Production Version: The production version may not be correctly set up to include the alternative sequences with the appropriate lot size ranges.
Solution:
Check Lot Size Configuration:
- Go to the material master (transaction code MM03) and check the lot size range defined for the material.
- Ensure that the lot size range in the production order matches the defined ranges in the material master.
Review Routing:
- Check the routing for the material (transaction code CA03) and ensure that the alternative sequences are correctly defined.
- Verify that the lot size ranges for the alternative sequences are appropriate and consistent with the production order.
Adjust Production Order:
- If the production order is incorrectly set up, you may need to adjust the lot size or the alternative sequence being used.
- You can do this by changing the production order (transaction code CO02) and ensuring that the correct alternative sequence is selected.
Check Production Version:
- Ensure that the production version used in the production order includes the correct routing and alternative sequences.
- You can check this in the material master under the "MRP 2" view.
Consult Documentation:
- Review SAP documentation or help files related to production planning and alternative sequences for additional guidance.
Related Information:
If the issue persists after checking the above points, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning.
Get instant SAP help. Start your 7-day free trial now.
CP438
Lot-size range of task list not in range of reference operation set
What causes this issue? You referenced an operation set in the sequence. However, the lot size range of the routing header exceeds the lot size range...
CP437
Wrong lot size range in task list header
What causes this issue? A reference operation set is referenced in routing &V1& &V2&, operation &V4& of sequence &V3&...
CP440
Lot-size range of alternative sequence not in range of reference op. set
What causes this issue? You referenced a reference operation set in your alternative sequence. However, the lot size range of the sequence exceeds th...
CP441
Incorrect lot size range for alternative sequence
What causes this issue? The lot-size range of the alternative sequence &V3& exceeds the lot-size range of the task list header.How to fix thi...
Click on this link to search all SAP messages.