Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 431
Message text: Reference operation set & has deletion flag
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CP431
- Reference operation set & has deletion flag ?The SAP error message CP431, which states "Reference operation set & has deletion flag," typically occurs in the context of production planning and control (PP) or project system (PS) modules. This error indicates that the reference operation set you are trying to use has been marked for deletion, which prevents it from being utilized in the current operation.
Cause: Deletion Flag Set: The reference operation set has been flagged for deletion in the system. This could happen if the operation set was intentionally marked for deletion by a user or through a data migration process. Data Integrity Issues: There may be inconsistencies in the data, such as orphaned records or incorrect references in the database. Configuration Changes: Changes in configuration settings or master data that affect the reference operation set may lead to this error.
Solution: Check the Reference Operation Set: Go to the transaction code CR03 (Display Reference Operation Set) and enter the reference operation set
Get instant SAP help. Sign up for our Free Essentials Plan.
CP430
The ref. op. set could not be exploded using the op. increment &.
What causes this issue? The operations of the referenced operation set cannot be inserted with the specified operation increment because the interval...
CP429
Enter an increment for operation numbering
What causes this issue? You have chosen an operation interval with the value 0. The operation interval is the increment with which operations in a r...
CP433
Warning: The reference operation set is already in use.
What causes this issue? You are attempting to change a reference operation set that is referenced in other task lists. These task lists will also be ...
CP434
Warning: The reference rate routing is being used
What causes this issue? You are attempting to change a reference rate routing which is already referenced in other task lists. The changes you make t...
Click on this link to search all SAP messages.