Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 422
Message text: The referenced operation set &1 &2 cannot be inserted
The operations of the reference operation set cannot be inserted since
the interval between the first referenced operation and the next
operation of the <GL:routing>routing</>/<GL:inspection_plan>plan</> is
too small.
If the operations cannot be inserted with the increment you have
specified, the system automatically sets the increment at one. Even
with this increment the operations cannot be inserted.
Increase the interval between the operations where the referenced
operations are to be inserted. To do this, assign higher numbers to
the operation or the operations that are to follow the reference
operation set.
Error message extract from SAP system. Copyright SAP SE.
CP422
- The referenced operation set &1 &2 cannot be inserted ?The SAP error message CP422 ("The referenced operation set &1 &2 cannot be inserted") typically occurs in the context of production planning or project management when there is an issue with the operation set being referenced in a routing or a production order. Here’s a breakdown of the potential causes, solutions, and related information for this error: Causes: Invalid Operation Set: The operation set you are trying to reference may not exist or may have been deleted. Incorrect Status: The operation set might be in a status that does not allow it to be used (e.g., it could be locked or not released). Inconsistent Data: There may be inconsistencies in the data related to the operation set, such as missing dependencies or incorrect configuration. Authorization Issues: The user may not have the necessary authorizations to access or insert the operation set.
Configuration Issues: There may be configuration settings in the system that prevent the operation set
Get instant SAP help. Sign up for our Free Essentials Plan.
CP420
--------- Reference to reference operation set ---------------
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP414
Operation & is used as reference operation for a sequence
What causes this issue? Operation &V1& of the referenced operation set you want to unlock is used as a reference operation for a sequence. A...
CP423
You cannot insert operations into a referenced operation set
What causes this issue? You want to insert one or more operations into a referenced operation set or a reference rate routing. However, you cannot in...
CP424
The routing is not released for production
How to fix this error? In the routing header, maintain a status releasing the task list for production.Error message extract from SAP system. Copyrig...
Click on this link to search all SAP messages.