Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 313
Message text: No. of branch operation is higher than no. of return operation.
The number of the branch operation for the sequence must not be higher
than the number of the return operation.
Please correct the number of the branch operation or the number of the
return operation.
Error message extract from SAP system. Copyright SAP SE.
CP313
- No. of branch operation is higher than no. of return operation. ?The SAP error message CP313 ("No. of branch operation is higher than no. of return operation") typically occurs in the context of production planning and control, particularly when dealing with routing and operations in a production order or a process order. This error indicates that there is a mismatch between the number of branch operations and return operations defined in the routing or the order.
Cause:
- Routing Configuration: The routing for the production order may have more branch operations than return operations. This can happen if the routing is not correctly defined or if there are missing return operations for the branches.
- Incorrect Order Setup: The production order may have been set up incorrectly, leading to an inconsistency in the operations defined.
- Changes in Routing: If the routing was modified after the order was created, it could lead to discrepancies between the defined operations and the actual operations in the order.
Solution:
- Review Routing: Check the routing associated with the production order. Ensure that the number of branch operations matches the number of return operations. You may need to add or adjust return operations to align with the branch operations.
- Adjust Production Order: If the routing is correct, review the production order settings. Ensure that the operations are correctly defined and that there are no discrepancies.
- Recreate Order: If the issue persists, consider recreating the production order after ensuring that the routing is correctly defined.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidance on routing and operations to ensure compliance with best practices.
- SAP Notes: Check for any relevant SAP Notes that may address this specific error or provide patches or updates that could resolve the issue.
Related Information:
CA03
(Display Routing) or CO02
(Change Production Order) to review and modify the routing and production order.By following these steps, you should be able to identify the cause of the CP313 error and implement a solution to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CP312
Lot size range of sequence is not within lot size range of header
What causes this issue? You are attempting to define a lot-size range for an alternative sequence which is outside of the task list header lot-size r...
CP311
Task list &1 sequence &2 is used as a ref. sequence by another sequence
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP314
Reference sequence does not exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP315
Please enter a sequence number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.