Message type: E = Error
Message class: CP - Task list messages: Core data
Message number: 216
Message text: Change number & exceeds comp. assignment to this oper. (Change number &)
During the date shift, a component assignment, shifted with the change
number &V1&, exceeds an existing change status with the change number
&V2&.
The date shift is allowed or not according to the Customizing settings.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CP216
- Change number & exceeds comp. assignment to this oper. (Change number &) ?The SAP error message CP216 ("Change number & exceeds comp. assignment to this oper. (Change number &)") typically occurs in the context of production planning and control, particularly when working with change numbers in the context of production orders or operations.
Cause:
This error message indicates that the change number you are trying to assign to a particular operation exceeds the allowed number of change assignments for that operation. In SAP, change numbers are used to track changes in production processes, and there are limits on how many changes can be associated with a specific operation.
Solution:
To resolve this error, you can take the following steps:
Check Change Number Assignment:
- Review the change numbers that have already been assigned to the operation in question. You can do this by navigating to the relevant production order and checking the operations and their associated change numbers.
Limit Configuration:
- Check the configuration settings for change number assignments in your SAP system. There may be a limit set on how many change numbers can be assigned to a single operation. If necessary, consult with your SAP administrator or configuration team to adjust these limits.
Remove Unused Change Numbers:
- If there are change numbers that are no longer needed or are incorrectly assigned, consider removing or deactivating them to free up space for new assignments.
Consult Documentation:
- Review SAP documentation or help resources related to change management and production order processing to understand the specific limits and configurations that apply to your system.
Contact SAP Support:
- If the issue persists and you cannot identify the cause, consider reaching out to SAP support for assistance. They can provide more detailed insights based on your specific system configuration and usage.
Related Information:
By following these steps, you should be able to address the CP216 error and continue with your production planning activities.
Get instant SAP help. Sign up for our Free Essentials Plan.
CP215
Change number & collides with comp. assignment to this oper. (Chge Nr. &)
What causes this issue? During the date shift, a component assignment, which is shifted with change number &V1&, collided with an existing ch...
CP214
Group counter already exists for the reference rate routing
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CP217
As a result of the date shift the TLheader has no valid standard sequence
What causes this issue? During the date shift, the effectivity of the standard sequence has been shifted to the extent that the task list header does...
CP220
========== General system errors (terminations) =======================
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.