Do you have any question about this error?
Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 797
Message text: No pegged requirement can be found for element &1 &2
There is no information on the requirements (request for a quotation,
quotation, secondary requirement) for the element selected.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CO797
- No pegged requirement can be found for element &1 &2 ?The SAP error message CO797 "No pegged requirement can be found for element &1 &2" typically occurs in the context of production planning and control, particularly when dealing with production orders, planned orders, or other related elements in the SAP system. This error indicates that the system is unable to find a pegged requirement for the specified element, which can lead to issues in production scheduling and material availability.
Causes:
- Missing Pegged Requirements: The most common cause is that there are no pegged requirements for the specified element (e.g., a component or material) in the production order or planned order.
- Incorrect Configuration: The configuration of the production order or the material master may not be set up correctly, leading to a lack of pegging.
- Data Inconsistencies: There may be inconsistencies in the data, such as missing or incorrect entries in the BOM (Bill of Materials) or routing.
- Order Status: The production order or planned order may be in a status that does not allow for pegging.
- Material Availability: The required materials may not be available, leading to a lack of pegged requirements.
Solutions:
- Check Pegging: Verify if there are any pegged requirements for the specified element. You can do this by checking the production order or planned order details.
- Review BOM and Routing: Ensure that the BOM and routing for the production order are correctly defined and that all components are included.
- Check Order Status: Make sure that the production order or planned order is in a status that allows for pegging. If necessary, change the status to allow for further processing.
- Material Availability Check: Perform a material availability check to ensure that all required materials are available for the production process.
- Recreate the Order: If the issue persists, consider recreating the production order or planned order to ensure that all settings are correct.
- Consult Documentation: Refer to SAP documentation or help resources for specific details related to the error message and its context.
Related Information:
If the problem persists after following these steps, it may be beneficial to consult with your SAP support team or a functional consultant who specializes in production planning and control.
Get instant SAP help. Start your 7-day free trial now.
CO796
No product cost collector could be determined for material &
What causes this issue? For <DS:GLOS.3526B68CAFAB52B9E10000009B38F974>order type</> &V2& it is predefined in Customizing that on ...
CO795
WBS element is not allowed to be changed
What causes this issue? The WBS element cannot be changed because it depends on the requirements grouping.System Response The system issues an error...
CO798
& is not a process order
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO799
Enter sales order/project/WBS element or order
What causes this issue? Your entries are not sufficient to call up the order progress report.System Response The system issues an error message and ...
Click on this link to search all SAP messages.