How To Fix CO733 - Only enter finish date for backward scheduling


CO733 - Overview

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 733

  • Message text: Only enter finish date for backward scheduling

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO733 - Only enter finish date for backward scheduling ?
    The SAP error message CO733 ("Only enter finish date for backward scheduling") typically occurs in the context of production planning and scheduling within the SAP system. This error indicates that when you are using backward scheduling, you should only specify the finish date for the operation or production order, and not the start date.
    
    Cause: The error arises when both the start date and finish date are entered in a scenario where backward scheduling is being applied. In backward scheduling, the system calculates the start date based on the finish date and the duration of the operation. Therefore, entering both dates creates a conflict.
    Solution: To resolve the CO733 error, follow these steps: Check Scheduling Type: Ensure that you are indeed using backward scheduling. This can typically be set in the production order or operation details. Enter Only Finish Date: When you are in the scheduling screen, only enter the finish date. Remove any entry in

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author