Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CO091 - Profit center & is not valid for the entire order lead time


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 091

  • Message text: Profit center & is not valid for the entire order lead time

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO091 - Profit center & is not valid for the entire order lead time ?

    The SAP error message CO091 indicates that the profit center specified in a cost object (such as an order) is not valid for the entire lead time of that order. This typically occurs in the context of controlling and cost accounting within SAP, particularly when dealing with internal orders, production orders, or project systems.

    Cause:

    1. Profit Center Validity: The profit center may not be valid for the entire period of the order's lead time. This can happen if the profit center is set to be valid only for a specific time frame, and the order's lead time extends beyond that period.
    2. Master Data Issues: The profit center may not be properly assigned or may have been changed or deactivated in the system.
    3. Order Dates: The start and end dates of the order may not align with the validity period of the profit center.
    4. Configuration Issues: There may be configuration settings in the controlling area that restrict the use of certain profit centers.

    Solution:

    1. Check Profit Center Validity: Verify the validity period of the profit center in the master data. Ensure that it covers the entire lead time of the order.

      • You can do this by navigating to the profit center master data in SAP and checking the validity dates.
    2. Adjust Order Dates: If possible, adjust the order's start and end dates to fall within the valid period of the profit center.

    3. Reassign Profit Center: If the current profit center is not valid, consider assigning a different profit center that is valid for the entire lead time of the order.

    4. Review Configuration: Check the configuration settings in the controlling area to ensure that there are no restrictions on the profit center usage.

    5. Consult with Finance Team: If you are unsure about the changes, consult with your finance or controlling team to ensure that any adjustments made are in line with accounting practices.

    Related Information:

    • Transaction Codes: You may use transaction codes like KE52 (Change Profit Center) or KSB1 (Cost Centers: Actual Line Items) to review and modify profit center assignments.
    • Documentation: Refer to SAP documentation or help files for detailed information on profit center accounting and order management.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • User Roles: Ensure that you have the necessary authorizations to make changes to profit center assignments and order details.

    By following these steps, you should be able to resolve the CO091 error and ensure that your orders are properly aligned with valid profit centers.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker