Stop googling SAP errors. Use our Free Essentials plan instead - no credit card needed. Start Now

Close

How To Fix CO049 - Enter a scheduling type


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CO - PPC order processing messages

  • Message number: 049

  • Message text: Enter a scheduling type

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CO049 - Enter a scheduling type ?

    The SAP error message CO049, which states "Enter a scheduling type," typically occurs in the context of production planning and control, particularly when working with production orders or when scheduling operations in SAP.

    Cause:

    The error arises when the system expects a scheduling type to be specified, but it is either missing or not correctly defined in the relevant transaction or configuration. The scheduling type is essential for determining how the system should handle the timing and sequencing of production activities.

    Solution:

    To resolve the CO049 error, you can take the following steps:

    1. Check the Transaction:

      • Ensure that you are in the correct transaction for creating or modifying production orders or scheduling operations.
      • Verify that you have filled in all required fields, including the scheduling type.
    2. Specify a Scheduling Type:

      • If you are creating or modifying a production order, look for a field labeled "Scheduling Type" or similar. Make sure to select an appropriate scheduling type from the dropdown list.
      • Common scheduling types include "Forward Scheduling," "Backward Scheduling," or "Asynchronous Scheduling," depending on your production process.
    3. Review Configuration Settings:

      • If the scheduling type is not available or is not being populated correctly, check the configuration settings in the SAP system.
      • Go to the configuration path: SPRO > Production > Production Order > Define Scheduling Types. Ensure that the scheduling types are correctly defined and active.
    4. User Authorizations:

      • Ensure that you have the necessary authorizations to access and modify scheduling types in the system.
    5. Consult Documentation:

      • Refer to SAP documentation or help files for more detailed information on scheduling types and their implications in your specific context.
    6. Contact Support:

      • If the issue persists after checking the above points, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.

    Related Information:

    • Scheduling Types: Understanding the different scheduling types and their implications on production planning can help in selecting the right one for your needs.
    • Production Order Management: Familiarity with the production order lifecycle and the role of scheduling in that process is crucial for effective production planning.
    • SAP Notes: Check SAP Notes for any known issues or patches related to the CO049 error message.

    By following these steps, you should be able to resolve the CO049 error and proceed with your production planning activities in SAP.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant