Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 046
Message text: Material & cannot be produced in-house
You have tried to create a production order for material &V1&. However,
the material type of this material does not allow in-house production.
Enter a material with a material type that allows in-house production.
Error message extract from SAP system. Copyright SAP SE.
CO046
- Material & cannot be produced in-house ?The SAP error message CO046 ("Material & cannot be produced in-house") typically indicates that the system has determined that the specified material cannot be manufactured internally due to various reasons. Here are some common causes, potential solutions, and related information for this error:
Causes:
Production Type Configuration: The material may not be set up for in-house production in the material master. This could be due to the production type being set to "external procurement" only.
Routing Issues: There may be no valid routing defined for the material, which is necessary for production planning and execution.
Bill of Materials (BOM): The material may not have a valid BOM, which is required to define the components needed for production.
Plant Settings: The plant settings may not allow for in-house production for that specific material.
Material Status: The material may have a status that restricts it from being produced in-house (e.g., "Blocked" or "Inactive").
Capacity Constraints: There may be capacity constraints in the production resources that prevent the material from being produced.
Solutions:
Check Material Master: Go to the material master (transaction code MM03) and verify the production type settings. Ensure that the material is marked for in-house production.
Review Routing: Check if a valid routing exists for the material (transaction code CA03). If not, create or assign a routing that defines the production process.
Verify BOM: Ensure that a valid BOM exists for the material (transaction code CS03). If it is missing, create a BOM that lists all the components required for production.
Plant Configuration: Review the plant settings to ensure that in-house production is allowed for the material. This can be checked in the configuration settings.
Check Material Status: Verify the material status in the material master. If it is blocked or inactive, change it to an active status.
Capacity Planning: Review the capacity planning for the production resources. If there are constraints, consider adjusting the production schedule or resources.
Related Information:
Transaction Codes:
SAP Notes: Check for any relevant SAP Notes that may address specific issues related to this error message.
Documentation: Refer to SAP documentation for detailed information on material master data, routing, and BOM management.
By following these steps, you should be able to identify the root cause of the CO046 error and implement the necessary changes to resolve it.
Get instant SAP help. Start your 7-day free trial now.
CO045
Material type & is not defined (check entry)
What causes this issue? Material type &V1& is not defined in the system.How to fix this error? There are two possibilities: Enter a material...
CO044
Material & not found in plant &
What causes this issue? Material &V1& does not exist in plant &V2&.How to fix this error? There are two possibilities: Enter a diffe...
CO047
Material & is planned for external procurement
What causes this issue? According to its material type, this material is planned for external procurement. It can, however, be produced in-house.Err...
CO048
Material & is intended for in-house production
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.