Do you have any question about this error?
Message type: E = Error
Message class: CO - PPC order processing messages
Message number: 032
Message text: Date & is later than the validity period of the factory calendar
Enter a date which lies within the validity period of the factory
calendar.
Error message extract from SAP system. Copyright SAP SE.
CO032
- Date & is later than the validity period of the factory calendar ?The SAP error message CO032 indicates that a date you are trying to use is outside the validity period of the factory calendar. This typically occurs in the context of production planning or scheduling when the system checks the dates against the defined factory calendar and finds that the date in question is not valid.
Cause:
- Invalid Date: The date you are trying to use (e.g., for production orders, scheduling, etc.) is set to a time that falls outside the defined working days or periods in the factory calendar.
- Factory Calendar Configuration: The factory calendar may not be configured correctly, or the validity period may not cover the date you are trying to use.
- Date Entry Error: There may be a simple error in the date entry, such as a typo or incorrect date format.
Solution:
- Check the Date: Verify the date you are trying to use. Ensure it is correct and intended for the operation you are performing.
- Review Factory Calendar:
- Go to the transaction code SCAL (Factory Calendar) to check the configuration of the factory calendar.
- Ensure that the validity period of the factory calendar includes the date you are trying to use.
- If necessary, extend the validity period of the factory calendar to include the required date.
- Adjust Production Order Dates: If the date is part of a production order, you may need to adjust the order dates to fall within the valid range of the factory calendar.
- Consult with Configuration Team: If you do not have access to change the factory calendar, consult with your SAP configuration team or system administrator to make the necessary adjustments.
Related Information:
By following these steps, you should be able to resolve the CO032 error and ensure that your dates align with the factory calendar's validity period.
Get instant SAP help. Start your 7-day free trial now.
CO031
& is not a working day (next working day: &)
What causes this issue? According to the factory calendar, the date that you entered is not a workday.System Response The message displays the next ...
CO030
Start date must not be later than finish date
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CO033
Date & is earlier than the validity period of the factory calendar
How to fix this error? Enter a date which lies withing the validity period of the factory calendar.Error message extract from SAP system. Copyright S...
CO034
The factory calendar & does not exist (contact system administrator)
What causes this issue? An internal error has occurred.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOKU ID TXHow to fix this e...
Click on this link to search all SAP messages.