How To Fix CNVC_SCWB_ZMESSAGE040 - Activity Confirm Analysis not completed for Project &


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNVC_SCWB_ZMESSAGE -

  • Message number: 040

  • Message text: Activity Confirm Analysis not completed for Project &

  • Show details Hide details
  • What causes this issue?

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    In order to proceed, the activities <ZK>Perform Usage Analysis</> and
    <ZK>Confirm Analysis</> must be completed successfully.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CNVC_SCWB_ZMESSAGE040 - Activity Confirm Analysis not completed for Project & ?

    The SAP error message CNVC_SCWB_ZMESSAGE040 indicates that the activity confirmation analysis for a specific project has not been completed. This error typically arises in the context of project management and controlling within SAP, particularly when dealing with project-related activities and confirmations.

    Causes:

    1. Incomplete Data Entry: The activity confirmation may not have been fully entered or saved in the system.
    2. Missing Authorizations: The user may lack the necessary permissions to perform the activity confirmation.
    3. Project Status: The project or activity may be in a status that does not allow for confirmations (e.g., closed or archived).
    4. System Configuration Issues: There may be configuration settings in the project system that prevent the completion of the confirmation analysis.
    5. Technical Issues: There could be underlying technical issues, such as database inconsistencies or system errors.

    Solutions:

    1. Check Data Entry: Ensure that all required fields for the activity confirmation are filled out correctly and that the confirmation has been saved.
    2. Review Authorizations: Verify that the user has the necessary authorizations to perform activity confirmations. This may involve checking roles and permissions in the user profile.
    3. Project Status Review: Check the status of the project and the specific activity. If the project is closed or archived, you may need to reopen it or consult with a project manager.
    4. Configuration Check: Review the configuration settings in the project system to ensure that they are set up correctly for activity confirmations.
    5. Consult Technical Support: If the issue persists, it may be necessary to consult with your SAP technical support team to investigate any potential system errors or database issues.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as CJ20N (Project Builder) or CJI3 (Project Actual Line Items) to analyze project data.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.
    • Documentation: Review SAP documentation on project management and activity confirmations for best practices and troubleshooting steps.
    • User Forums: Engage with SAP community forums or user groups for insights from other users who may have encountered similar issues.

    By following these steps, you should be able to identify the root cause of the error and implement a solution to resolve it.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author