How To Fix CNVA_PCREA_MSG412 - No changes possible: Scope was already confirmed


CNVA_PCREA_MSG412 - Overview

  • Message type: E = Error

  • Message class: CNVA_PCREA_MSG - LT Profit Center Reorganization Analysis

  • Message number: 412

  • Message text: No changes possible: Scope was already confirmed

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNVA_PCREA_MSG412 - Details

  • The SAP error message CNVA_PCREA_MSG412 with the description "No changes possible: Scope was already confirmed" typically occurs in the context of project management or project system modules, particularly when dealing with project scope changes or confirmations in SAP.
    
    Cause: This error message indicates that the scope of a project or a specific project element has already been confirmed, meaning that no further changes can be made to it. This is often a safeguard to ensure that once a project scope is confirmed, it remains stable and prevents any unintended modifications that could affect project integrity or reporting.
    Solution: To resolve this error, you can consider the following steps: Check Confirmation Status: Verify the confirmation status of the project or the specific element you are trying to modify. If it has indeed been confirmed, you will need to assess whether changes are necessary or if you can proceed without them. Revoke Confirmation: If changes are absolutely necessary,

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNVA_PCREA_MSG412 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker