Message type: E = Error
Message class: CNV_PE_PCL - Messages for PE<->PCL interaction
Message number: 034
Message text: Failed to set status 'Success' for activity &1
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CNV_PE_PCL034
- Failed to set status 'Success' for activity &1 ?The SAP error message CNV_PE_PCL034 indicates that there was a failure in setting the status to 'Success' for a specific activity during a data migration or conversion process. This error is typically encountered in the context of SAP's data migration tools, such as the SAP S/4HANA Migration Cockpit or other conversion tools.
Cause:
The error can be caused by several factors, including:
- Incomplete Data Processing: The activity may not have completed successfully due to issues with the data being processed, such as data inconsistencies or validation errors.
- Technical Issues: There may be underlying technical issues, such as database locks, system performance problems, or connectivity issues.
- Configuration Errors: Incorrect configuration settings in the migration tool or the source/target systems can lead to this error.
- Authorization Issues: The user executing the migration may not have the necessary authorizations to update the status of the activity.
Solution:
To resolve the error, you can take the following steps:
- Check Logs: Review the detailed logs for the specific activity that failed. This can provide insights into what went wrong during the processing.
- Data Validation: Ensure that the data being migrated is clean and meets all the necessary validation rules. Look for any inconsistencies or errors in the data.
- Re-run the Activity: If the issue was transient, you may try to re-run the activity after addressing any identified issues.
- Check Authorizations: Verify that the user has the necessary authorizations to perform the migration and update the status.
- System Performance: Ensure that the system is performing optimally and that there are no locks or performance bottlenecks affecting the migration process.
- Consult Documentation: Refer to the SAP documentation for the specific migration tool you are using for any additional troubleshooting steps or known issues.
Related Information:
By following these steps, you should be able to identify the root cause of the error and implement a solution to successfully set the status to 'Success' for the activity in question.
Get instant SAP help. Start your 7-day free trial now.
CNV_PE_PCL033
Status of activity &1 was set to 'Success'
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE_PCL032
Activity status was set to 'Success' due to project assignment
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE_PCL035
Failed to insert new PCL activity &1 into process tree
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_PE_PCL036
Activity &1 was started in background
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...