How To Fix CNV_MBT_46102 - PACKID & is a merged package


CNV_MBT_46102 - Overview

  • Message type: E = Error

  • Message class: CNV_MBT_46 - PCL message class

  • Message number: 102

  • Message text: PACKID & is a merged package

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNV_MBT_46102 - Details

  • The SAP error message CNV_MBT_46102 indicates that the package ID specified (denoted as PACKID) is a merged package. This typically occurs in the context of data migration or conversion processes, particularly when using the SAP S/4HANA Migration Cockpit or similar tools.
    
    Cause: The error arises when the system detects that the package you are trying to work with has been merged with another package. This can happen due to various reasons, such as: Data Migration Process: During the data migration process, packages may be merged to optimize the data load or to handle dependencies between different data sets. Configuration Changes: Changes in the configuration of the migration project or the underlying data model may lead to the merging of packages. Incorrect Package Reference: Attempting to reference a package that has been altered or is no longer available in its original form.
    Solution: To resolve this error, you can take the following steps: Check Package Status: Verify the status

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_MBT_46102 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker