Do you have any question about this error?
Message type: E = Error
Message class: CNV_MBT - PCL message class
Message number: 418
Message text: Project &1 cannnot be created.
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CNV_MBT418
- Project &1 cannnot be created. ?The SAP error message CNV_MBT418, which states "Project &1 cannot be created," typically occurs during the execution of a migration project in SAP, particularly when using the SAP S/4HANA Migration Cockpit or similar tools. This error can arise due to various reasons, and here are some common causes, potential solutions, and related information:
Causes:
- Missing Authorizations: The user attempting to create the project may not have the necessary authorizations or roles assigned in the SAP system.
- Incorrect Configuration: There may be issues with the configuration settings in the migration cockpit or the project settings.
- Existing Project: A project with the same name or identifier may already exist, leading to a conflict.
- Technical Issues: There could be underlying technical issues, such as database problems or system inconsistencies.
- Transport Issues: If the project is being created in a system that is not properly configured for transport, it may lead to this error.
Solutions:
- Check Authorizations: Ensure that the user has the necessary authorizations to create a project. This may involve checking roles and permissions in transaction SU01 or SU53.
- Review Configuration: Verify the configuration settings in the migration cockpit. Ensure that all required parameters are correctly set.
- Check for Existing Projects: Use transaction CNV_MBT_PROJECT to check if a project with the same name already exists. If it does, consider using a different name or deleting the existing project if it is no longer needed.
- System Health Check: Perform a system health check to identify any underlying technical issues. This may involve checking logs, database consistency, and system performance.
- Consult SAP Notes: Look for relevant SAP Notes that may address this specific error. SAP frequently updates its knowledge base with solutions for known issues.
- Contact SAP Support: If the issue persists after trying the above solutions, consider reaching out to SAP Support for further assistance.
Related Information:
By following these steps, you should be able to diagnose and resolve the CNV_MBT418 error effectively.
Get instant SAP help. Start your 7-day free trial now.
CNV_MBT417
Package &1 created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_MBT416
Package &1 is already active
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_MBT419
Subproject &1 cannot be created
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_MBT420
&1. Call Extended Process Monitor to check status details
What causes this issue? The execution of mass starting activities has been detected by the process status refresh procedure . The displayed status of...
Click on this link to search all SAP messages.