How To Fix CNV_IUUC_REPLICATION264 - Scheduling failed for action &1


CNV_IUUC_REPLICATION264 - Overview

  • Message type: E = Error

  • Message class: CNV_IUUC_REPLICATION - IUUC replication messages (HANA)

  • Message number: 264

  • Message text: Scheduling failed for action &1

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNV_IUUC_REPLICATION264 - Details

  • The SAP error message CNV_IUUC_REPLICATION264 indicates that there was a failure in scheduling a replication action in the context of SAP Landscape Transformation (SLT) or data replication processes. This error typically arises during the configuration or execution of data replication tasks, particularly when using the SAP Data Services or SLT for real-time data replication.
    Possible Causes:
    
    
    Configuration Issues: Incorrect configuration settings in the SLT system or the source/target systems can lead to scheduling failures. Resource Limitations: Insufficient system resources (CPU, memory, etc.) on the SLT server or the source/target systems can prevent the scheduling of replication tasks. Network Issues: Connectivity problems between the source and target systems can disrupt the scheduling process. Authorization Problems: The user executing the replication may lack the necessary authorizations to perform the action. System Locks: Existing locks on the database or other processes may prevent the scheduling of new actions. Transport Layer Issues: Problems with the transport layer or middleware can also

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_IUUC_REPLICATION264 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker