How To Fix CNV_DMC_SIN113 - Plant cannot be initial in &1, the Opening period key is &2


CNV_DMC_SIN113 - Overview

  • Message type: E = Error

  • Message class: CNV_DMC_SIN - Messages for s-innovations migration

  • Message number: 113

  • Message text: Plant cannot be initial in &1, the Opening period key is &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNV_DMC_SIN113 - Details

  • The SAP error message CNV_DMC_SIN113 typically occurs during data migration or conversion processes, particularly when using the SAP Data Migration Cockpit (DMC) or similar tools. This error indicates that a plant cannot be initialized in the specified context because the opening period key is not valid or not set up correctly.
    
    Cause: Invalid Opening Period: The opening period key specified for the plant is either not defined or is outside the valid range of periods for the fiscal year.
    Configuration Issues: The plant may not be properly configured in the system, or the necessary settings for the opening period may not have been completed. Data Migration Issues: If you are migrating data from another system, the opening period key may not have been correctly mapped or transferred.
    Solution: Check Opening Period Configuration: Go to the configuration settings in SAP and verify that the opening period key for the plant is correctly defined. Ensure that the opening period is

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_DMC_SIN113 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author