How To Fix CNV_CMIS_G024 - All subsequent nodes removed from the process tree


CNV_CMIS_G024 - Overview

  • Message type: E = Error

  • Message class: CNV_CMIS_G - CMIS: general messages

  • Message number: 024

  • Message text: All subsequent nodes removed from the process tree

  • Show details Hide details
  • What causes this issue?

    The system has determined that either
    A) the upgrade status is 'C' (Cancel), because the sender system
    contains at least one component/add-on, release or support package level
    which does not exist in the receiver system, or
    B) some changes concerning the components/add-ons, releases or support
    package levels in either the receiver system or the sender system
    occurred after the completion of the activity <ZK>Check Release and
    Component Status</>.

    System Response

    The system removes all subsequent nodes in the process tree since the
    system encountered one of the problems mentioned above.

    How to fix this error?

    Analyze the situation.
    In case A), a migration is not possible.
    In case B), solve the problems that the system indicated in the messages
    above, and start again with a new package.

    Procedure for System Administrators

    If you need assistance in solving the problem, contact SAP for support.

    Error message extract from SAP system. Copyright SAP SE.


CNV_CMIS_G024 - Details

  • The SAP error message CNV_CMIS_G024 indicates that all subsequent nodes have been removed from the process tree during a conversion or migration process. This error typically occurs in the context of data migration or system conversion projects, particularly when using SAP's Conversion and Migration tools.
    
    Cause: The error can be caused by several factors, including: Data Integrity Issues: If there are inconsistencies or issues with the data being processed, it may lead to the removal of nodes from the process tree. Configuration Problems: Incorrect configuration settings in the migration or conversion tools can lead to this error. Process Termination: If a previous step in the process fails or is terminated unexpectedly, it can cause subsequent nodes to be removed. Resource Limitations: Insufficient system resources (like memory or processing power) can lead to failures in processing, resulting in this error.
    Solution: To resolve the CNV_CMIS_G024 error, consider the following steps: Check Logs: Review the detailed logs generated during the migration

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_CMIS_G024 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant