Do you have any question about this error?
Message type: E = Error
Message class: CNV_CDOP_CA - CDOP Clearing Analysis
Message number: 029
Message text: Too few work processes available; enter a value greater than 1
You have chosen to perform the remote comparison in parallel mode but
have not specified a sufficient number of work processes.
It is not possible to perform parallel execution without having at
least two work processes.
Enter a value greater than 1.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CNV_CDOP_CA029
- Too few work processes available; enter a value greater than 1 ?The SAP error message CNV_CDOP_CA029 indicates that there are not enough work processes available in the SAP system to perform the requested operation. This error typically occurs during data conversion or migration processes, where multiple work processes are required to handle the workload efficiently.
Cause:
- Insufficient Work Processes: The SAP system is configured with too few work processes to handle the current workload. This can happen if the system is under heavy load or if the configuration settings for work processes are not optimized.
- System Configuration: The instance profile settings may limit the number of available work processes.
- Resource Constraints: The underlying hardware or virtual machine may not have enough resources (CPU, memory) to support additional work processes.
Solution:
Increase Work Processes:
- Access the SAP instance profile (usually found in the
instance profile
directory).- Look for parameters related to work processes, such as
rdisp/wp_no_dia
,rdisp/wp_no_btc
,rdisp/wp_no_vb
, etc.- Increase the values for these parameters to allow more dialog, background, or update work processes, depending on your needs.
- Save the changes and restart the SAP instance for the changes to take effect.
Monitor System Load:
- Use transaction codes like
SM50
orSM66
to monitor the current workload and see if there are any processes that are consuming excessive resources.- Identify and resolve any bottlenecks or long-running processes that may be affecting the availability of work processes.
Check System Resources:
- Ensure that the server has adequate CPU and memory resources. If the server is under-provisioned, consider upgrading the hardware or optimizing the existing workload.
Review Background Jobs:
- Check for any background jobs that may be consuming work processes unnecessarily. You can use transaction
SM37
to review and manage background jobs.Consult SAP Notes:
- Look for relevant SAP Notes that may provide additional guidance or patches related to this error message.
Related Information:
SM50
- Monitor work processes.SM66
- Global work process overview.SM37
- Monitor background jobs.By following these steps, you should be able to resolve the CNV_CDOP_CA029 error and ensure that your SAP system has sufficient work processes to handle the required operations.
Get instant SAP help. Start your 7-day free trial now.
CNV_CDOP_CA028
Error while reading the statistics file
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_CDOP_CA027
Deactivation of statistics failed on the remote system
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV_CDOP_CA030
Enter at least one program, class or function group
What causes this issue? You have opted for ad-hoc execution of this report. However you have not specified any programs classes or function groups ...
CNV_CDOP_CA031
Error while displaying project overview document
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.