How To Fix CNV_20310_CHECK027 - No priority provided for target cost center &1 target controlling area &2


CNV_20310_CHECK027 - Overview

  • Message type: E = Error

  • Message class: CNV_20310_CHECK -

  • Message number: 027

  • Message text: No priority provided for target cost center &1 target controlling area &2

  • Show details Hide details
  • What causes this issue?

    No priority indicator specified for target cost center &V1& in
    controlling area &V2&. This can lead to inconsistencies during the
    conversion.
    To run the transformation solution each target cost center must have
    exactly one source cost center with the priority indicator set
    (reference cost center) or exactly one source cost center from the
    reference controlling area in case the transformation solution
    Controlling Area Merge is used.
    If the transformation solution Controlling Area Merge is used, and no
    priority is provided for a target cost center, the priority indicator is
    taken from the controlling area mapping. This is only possible if
    exactly one of the source cost centers is in the reference controlling
    area. If two or more of the source cost centers are in the reference
    controlling area multiple priority indicators are provided. If none of
    the source cost centers is in the reference controlling area no priority
    indicator is provided.
    You cannot run the transformation solution because certain prerequisites
    have not been met. Please change your mapping accordingly.

    System Response

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    How to fix this error?

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


CNV_20310_CHECK027 - Details

  • The SAP error message CNV_20310_CHECK027 indicates that there is an issue with the configuration of a target cost center in the context of a data migration or conversion process. Specifically, the error states that no priority has been provided for the specified target cost center and controlling area.
    
    Cause: The error typically arises during a data migration process, such as when using the SAP S/4HANA Migration Cockpit or other data migration tools. The root causes can include: Missing Priority Assignment: The target cost center does not have a priority assigned in the migration settings. Priorities are often used to determine the order in which cost centers are processed or to manage conflicts during the migration.
    Configuration Issues: There may be issues in the configuration of the migration project, such as missing or incorrect settings in the mapping of source to target data. Data Integrity Issues: The data being migrated may not meet the required criteria

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_20310_CHECK027 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker