How To Fix CNV_20100454 - Validity period of &1 differs from &2 in controlling area &3 (CSKB-DATAB)


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CNV_20100 - Messageclass for chart of account conversion

  • Message number: 454

  • Message text: Validity period of &1 differs from &2 in controlling area &3 (CSKB-DATAB)

  • Show details Hide details
  • What causes this issue?

    According to the mapping table, you want to merge the cost elements
    <(>&<)>V1& and <(>&<)>V2& in controlling area <(>&<)>V3
    & into a cost element called <(>&<)>V4&. Due to the validity
    periods, which are different for the two original cost elements,
    overlaps may occur.
    Depending on the settings in the mapping table maintenance (priority
    indicator), changes in the start end end dates of the cost element as
    well as overlaps of the validity periods for the still existing validity
    intervals for a cost element may occur.
    The system resolves these inconsistencies in the activity <ZK>Adapt
    Validity Dates for Cost Elements</> in the phase <ZK>Postprocessing
    Programs During System Lock</> by processing all validity intervals that
    exist for a cost element at this point in accordance with the following
    rules:
    The system looks at all validity intervals for a cost element starting
    from the oldest interval (oldest valid-from date) and proceeding into
    the future.
    The valid-from date that lies furthest in the past <ZH>after</> the
    conversion (CSKB-DATAB) is set to the valid-from date that lay furthest
    in the past <ZH>before</> the conversion.
    If the valid-from date of the next interval is smaller than the valid-to
    date of the interval that is currently being processed, the valid-from
    date of the next interval is set to the valid-to date of the interval
    that is currently being processed (plus one day).
    The valid-to date that lies furthest in the future <ZH>after</> the
    conversion (CSKB-DATBI) is set to the valid-to date that lay furthest in
    the future <ZH>before</> the conversion.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    How to fix this error?

    Note that checks or adjustments regarding the validity of cost elements
    may be required after the conversion.
    Make sure that the adjustment logic corresponds to your requirements. If
    necessary, adjust the validity periods manually after the conversion.

    Procedure for System Administrators

    This message is merely a warning that postprocessing may be necessary
    after the conversion.
    The log of the program for adjusting the validity dates for cost
    elements contains detailed information about where to make the
    adjustments.

    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CNV_20100454 - Validity period of &1 differs from &2 in controlling area &3 (CSKB-DATAB) ?

    The SAP error message CNV_20100454 indicates that there is a discrepancy in the validity period of a certain object (usually a cost center or internal order) in the controlling area. Specifically, it means that the validity period of the object being processed does not match the expected validity period defined in the controlling area.

    Cause:

    1. Mismatch in Validity Periods: The object you are trying to process has a validity period that does not align with the controlling area's settings. This can happen if the object was created or modified with a different date range than what is defined in the controlling area.
    2. Data Migration Issues: If you are migrating data from another system or performing a data upload, the validity periods of the objects may not have been correctly aligned with the controlling area settings.
    3. Configuration Errors: There may be configuration issues in the controlling area that lead to inconsistencies in the validity periods.

    Solution:

    1. Check Validity Periods: Review the validity periods of the object in question and compare them with the controlling area's settings. Ensure that they match.
    2. Adjust Object Dates: If the object's validity period is incorrect, you may need to adjust the start and end dates to align with the controlling area.
    3. Data Migration Review: If this error occurred during a data migration process, review the migration data to ensure that all objects have the correct validity periods before importing them into SAP.
    4. Configuration Review: Check the configuration settings in the controlling area to ensure that they are set up correctly and that there are no discrepancies.
    5. Consult Documentation: Refer to SAP documentation or notes related to this error message for any specific guidance or patches that may address the issue.

    Related Information:

    • Transaction Codes: You may need to use transaction codes like KS01 (Create Cost Center), KS02 (Change Cost Center), or KSB1 (Cost Centers: Actual Line Items) to review and modify the relevant objects.
    • SAP Notes: Check SAP Notes for any known issues or updates related to this error message.
    • Support: If the issue persists after checking the above points, consider reaching out to SAP support for further assistance.

    By following these steps, you should be able to resolve the CNV_20100454 error and ensure that the validity periods are consistent across your SAP system.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo simplifies finding the accurate answers to SAP message errors. I now use every week. A must have tool for anyone working with SAP! Highly recommended!
Rate 1
Kent Bettisworth
Executive SAP Consultant