Message type: E = Error
Message class:  CNV_20100 - Messageclass for chart of account conversion 
Message number: 203
Message text: Merge at A/B level: No priority control for merge to cost element &1
It was found that two or more old cost elements ae mapped to target &V1&
, but the priority indicator is set for none of these.
If the priority indicator is not set, it is not clear which settings
will take priority when the cost elements are merged into &V1&.
Besides, the check showed that the merge will take place at
<DS:TX.CNV_20100_TX_ASEGMENT>A level</> as well as at
<DS:TX.CNV_20100_TX_BSEGMENT>B level</>.
The following cost elements in controlling area &V4& are merged at B
level:
&V2& -> &V1&
&V3& -> &V1&
Set the priority indicator for one of the entries with target cost
element &V1&.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
&NOTE&Error message extract from SAP system. Copyright SAP SE.
The SAP error message CNV_20100203 typically occurs during the data migration process, particularly when using the SAP S/4HANA Migration Cockpit or other data migration tools. This error indicates that there is an issue with merging cost elements at the Activity-Based (A/B) level, specifically that there is no priority control defined for the merge operation.
Cause: Missing Priority Control: The error suggests that the system does not have a defined priority for how to handle the merging of cost elements. This can happen if the configuration for merging cost elements is incomplete or not set up correctly. Data Inconsistencies: There may be inconsistencies in the data being migrated, such as duplicate cost elements without a clear priority for which one should be retained.
Configuration Issues: The configuration settings for the migration process may not be properly aligned with the requirements for merging cost elements.
Solution: Define Priority Control: Check the configuration settings for merging cost elements in
 Get instant SAP help. Sign up for our Free Essentials Plan.
Get instant SAP help. Sign up for our Free Essentials Plan. 
CNV_20100202 Merge at A level: No priority control for merge to cost element &1
What causes this issue?  The system found that two or more old cost elements are mapped to target &V1&, but the priority indicator is set for ...
CNV_20100201 Merge at A/B level: No priority control for merge to account &1
What causes this issue?  The system found that two or more old G/L accounts are mapped to target &V1&, but the priority indicator is set for n...
CNV_20100204 Cntry-spec. CoA &3 (to be implemented) is also target for a conversion
What causes this issue?  You are going to implement the country-specific chart of accounts &V3& for target chart of accounts &V2& (map...
CNV_20100205 CoA merge: Source account &1 exists; implicit merge by account rename
What causes this issue?  The planned chart of accounts merge will lead to implicit merges of accounts. The check of the G/L accounts that will be merg...