How To Fix CNV_20100119 - Priority control does not work for merge to account &2 in company code &3


CNV_20100119 - Overview

  • Message type: E = Error

  • Message class: CNV_20100 - Messageclass for chart of account conversion

  • Message number: 119

  • Message text: Priority control does not work for merge to account &2 in company code &3

  • Show details Hide details
  • What causes this issue?

    When checking the priority indicators, the system found that the
    priority indicator in the mapping table was set only once for all merges
    to target account &V2& (which is correct).
    The priority indicator was set for the following mapping:
    &V1& -> &V2&
    In company code &V3&, the source account &V1& does not exist, while at
    least two other accounts are merged to target account &V2&.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    System Response

    As the source account &V1& with prio = X does not exist in company code
    &V3&, it is not clear which settings will take priority when the other
    accounts in this company code are merged to target account &V2&.

    How to fix this error?

    Maintain the priority indicator for target account &V2& in company code
    &V3& via activity 'Maintain B Segment Merges'. Alternatively check the
    settings for the relevant target account &V2& after the conversion.
    &ADDITIONAL_HINTS&
    Note that the priority indicator must not be set more than <ZH>once</>
    for all merges to a given target account. This is also valid for
    cross-chart of account merges.
    The super priority is mainly useful for tables whose key contains the
    chart of accounts, but no other field that needs to be converted in a
    chart of accounts conversion, such as account assignment (table T030 and
    others).
    Note also that even if a <DS:TX.CNV_20100_TX_SUPERPRIO>super priority</>
    was defined at chart of accounts level it is still not clear which
    settings (from which account or cost element) will prevail during a
    merge to a given target if <ZH>more than one</> account or cost element
    from the <ZH>same</> chart of accounts is merged into this target.

    Error message extract from SAP system. Copyright SAP SE.


CNV_20100119 - Details

  • The SAP error message CNV_20100119 indicates an issue related to priority control during a merge operation for accounts in a specific company code. This error typically arises in the context of data migration or conversion processes, particularly when using SAP's tools for data transformation, such as the SAP S/4HANA Migration Cockpit or other data migration tools.
    
    Cause: The error message suggests that there is a problem with the priority control settings for the merge operation. This can occur due to several reasons: Incorrect Configuration: The priority settings for the accounts being merged may not be correctly configured. Data Inconsistencies: There may be inconsistencies in the data of the accounts being merged, such as missing or conflicting information. Company Code Issues: The specified company code may not be set up correctly or may not allow for the merging of accounts as intended. Technical Limitations: There may be technical limitations or restrictions in the system that prevent the

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_20100119 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker