How To Fix CNV_10993_MSG289 - Optimizie strings for PCL Package Id &1 is started.


CNV_10993_MSG289 - Overview

  • Message type: E = Error

  • Message class: CNV_10993_MSG - Messages for Coding Scan

  • Message number: 289

  • Message text: Optimizie strings for PCL Package Id &1 is started.

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNV_10993_MSG289 - Details

  • The SAP error message CNV_10993_MSG289 typically relates to the conversion process in SAP systems, particularly when dealing with the optimization of strings for PCL (Print Control Language) packages. This error can occur during data migration or system conversion processes, especially when using SAP's Conversion Tools.
    
    Cause: The error message indicates that the optimization process for the specified PCL package ID has started but may not have completed successfully. This can be due to several reasons, including: Data Inconsistencies: There may be inconsistencies or issues with the data being processed.
    Configuration Issues: The configuration settings for the conversion process may not be set correctly. Resource Limitations: Insufficient system resources (like memory or processing power) can lead to failures in processing. Missing Dependencies: Required components or dependencies for the conversion process may be missing or not properly configured.
    Solution: To resolve this error, you can take the following steps: Check Logs: Review the logs related to the conversion process to identify

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNV_10993_MSG289 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker