Do you have any question about this error?
Message type: E = Error
Message class: CNV - Conversion: Messages for Conversion Services (CNCC)
Message number: 523
Message text: Conversion started as test run -> no database changes!
The conversion program was started in test mode.
This means that the fields are translated in the same way as during the
update run, but the changed data is not stored in the database.
The conversion results contain the values for the read and translated
rates that would have been created in an update run.
The system issues an error message and will not allow you to continue with this transaction until the error is resolved.
Error message extract from SAP system. Copyright SAP SE.
CNV523
- Conversion started as test run -> no database changes! ?The SAP error message "CNV523 Conversion started as test run -> no database changes!" indicates that a conversion process was initiated in test mode. In this mode, the system simulates the conversion process without making any actual changes to the database. This is typically done to verify the conversion logic and ensure that everything will work correctly before executing the conversion in a production environment.
Cause:
- Test Run Mode: The conversion was explicitly started in test mode. This is often done to check for errors or issues without affecting the actual data.
- Configuration Settings: The settings in the conversion program may have been configured to run in test mode.
- User Input: The user may have selected an option to run the conversion as a test run.
Solution:
- Run in Production Mode: If you are ready to perform the actual conversion, you need to run the conversion program in production mode. This usually involves changing a parameter or option in the program to indicate that you want to perform a real conversion.
- Check Parameters: Review the parameters or options set for the conversion program. Look for any flags or settings that indicate a test run and change them accordingly.
- Review Documentation: Consult the documentation for the specific conversion program you are using to understand how to switch from test mode to production mode.
- Testing: If you are still in the testing phase, ensure that you thoroughly test the conversion process before executing it in production to avoid data integrity issues.
Related Information:
By following these steps, you should be able to resolve the issue and proceed with the conversion as intended.
Get instant SAP help. Start your 7-day free trial now.
CNV522
The activity "&1" can not be restarted
What causes this issue? Status management has detected a situation that does not allow the subsequent execution of the activity "&V1&&qu...
CNV521
Program & does not exist in the status management for package &
What causes this issue? You either deleted a program from status management or added a program that is not included in status management to the packa...
CNV524
Table & already has entries in dummy client CNV
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNV525
&1 is the maximal number of programs that can be generated
What causes this issue? The maximal number of generated programs is reached. It is not possible to generate more than &V1& programs.System Re...
Click on this link to search all SAP messages.