How To Fix CNPOC_MSG_CLASS024 - Estimate for POC not allowed for &1 &2


CNPOC_MSG_CLASS024 - Overview

  • Message type: E = Error

  • Message class: CNPOC_MSG_CLASS - Message class for handling CNPOC function group.

  • Message number: 024

  • Message text: Estimate for POC not allowed for &1 &2

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CNPOC_MSG_CLASS024 - Details

  • The SAP error message CNPOC_MSG_CLASS024 ("Estimate for POC not allowed for &1 &2") typically occurs in the context of Project System (PS) and is related to the Percentage of Completion (POC) method for revenue recognition. This error indicates that an attempt was made to create or process an estimate for a project or WBS element that does not allow for POC estimates.
    
    Cause: POC Not Allowed: The project or WBS element is configured in such a way that it does not permit POC estimates. This could be due to settings in the project definition or WBS element that restrict the use of POC. Project Status: The project or WBS element may be in a status that does not allow for POC calculations or estimates. Configuration Settings: The configuration settings for the project type or the controlling area may not allow for POC estimates. Missing Data: Required data for POC calculations may be missing or incomplete.
    Solution: Check

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CNPOC_MSG_CLASS024 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
The AI Support Assistant is great. It provides comprehensive assistance even on the most difficult issues. I highly recommend this service.
Rate 1
John Jordan
SAP Consultant & Author