Do you have any question about this error?
Message type: E = Error
Message class: CNPOC_MSG_CLASS - Message class for handling CNPOC function group.
Message number: 007
Message text: Planned &1 and actual &1 should be the same
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CNPOC_MSG_CLASS007
- Planned &1 and actual &1 should be the same ?The SAP error message CNPOC_MSG_CLASS007 indicates a discrepancy between planned and actual values in a project or cost center. Specifically, it states that the planned value and the actual value for a particular cost element or activity should be the same, but they are not.
Cause:
This error typically arises in the context of project management or controlling when:
- Data Entry Errors: There may have been incorrect data entry for either planned or actual costs.
- Configuration Issues: The configuration settings in the system may not align with the expected behavior for cost planning and actuals.
- Timing Issues: The planned and actual values may not have been updated or posted correctly, leading to discrepancies.
- Incorrect Settings: The settings for the cost element or activity type may not allow for differences between planned and actual values.
Solution:
To resolve this error, you can take the following steps:
Verify Data Entry:
- Check the entries for both planned and actual costs. Ensure that they are entered correctly and match as expected.
Review Configuration:
- Examine the configuration settings for the project or cost center. Ensure that the settings allow for the planned and actual values to be compared correctly.
Check for Updates:
- Ensure that all relevant postings have been made. If there are pending postings, complete them to update the actual values.
Adjust Planning:
- If the actual costs are correct and the planned costs need to be adjusted, consider updating the planning data to reflect the actual situation.
Consult Documentation:
- Review SAP documentation or help resources for specific guidance on handling this error in your version of SAP.
Contact Support:
- If the issue persists, consider reaching out to your SAP support team or consulting with an SAP expert for further assistance.
Related Information:
By following these steps, you should be able to identify the cause of the discrepancy and take appropriate action to resolve the error.
Get instant SAP help. Start your 7-day free trial now.
CNPOC_MSG_CLASS006
Measurement method not present for &1 progress version &2
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS005
Object is locked
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS008
Enter activity
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CNPOC_MSG_CLASS009
Enter planned POC or actual POC
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.