CNIF_PI035 - Overview

  • Message type: E = Error

  • Message class: CNIF_PI - BAPI Notifications of Project System

  • Message number: 035

  • Message text: More than one project is being used

  • Show details Hide details
  • What causes this issue?

    You have called one of the individual BAPIs listed below. As a result,
    however, more than one project is being used in the current LUW
    (logical unit of work). This is not allowed for data consistency
    reasons.

    The system issues an error message and will not allow you to continue with this transaction until the error is resolved.

    Individual BAPIs:
    Method ProjectDefinitionPI:
    BAPI Method
    BAPI_BUS2001_CREATE ProjectDefinitionPI.CreateSingle
    BAPI_BUS2001_CHANGE ProjectDefinitionPI.Change
    BAPI_BUS2001_DELETE ProjectDefinitionPI.Delete
    BAPI_BUS2001_SET_STATUS ProjectDefinitionPI.SetStatus
    Method WBSPI:
    BAPI Method
    BAPI_BUS2054_CREATE_MULTI WBSPI.CreateMultiple
    BAPI_BUS2054_CHANGE_MULTI WBSPI.ChangeMultiple
    BAPI_BUS2054_DELETE_MULTI WBSPI.DeleteMultiple
    BAPI_BUS2001_SET_STATUS WBSPI.SetStatus
    Method NetworkPI
    BAPI Method
    BAPI_BUS2002_CREATE NetworkPI.CreateFromData
    BAPI_BUS2002_CHANGE NetworkPI.Change
    BAPI_BUS2002_DELETE NetworkPI.Delete
    BAPI_BUS2002_ACT_CREATE_MULTI NetworkPI.ActCreateMultiple
    BAPI_BUS2002_ACT_CHANGE_MULTI NetworkPI.ActChangeMultiple
    BAPI_BUS2002_ACT_DELETE_MULTI NetworkPI.ActDeleteMultiple
    BAPI_BUS2002_ACTELEM_CREATE_M NetworkPI.ActElemCreateMultiple
    BAPI_BUS2002_ACTELEM_CHANGE_M NetworkPI.ActElemChangeMultiple
    BAPI_BUS2002_ACTELEM_DELETE_M NetworkPI.ActElemDeleteMultiple
    BAPI_BUS2002_SET_STATUS NetworkPI.SetStatus
    One or more of the above individual BAPIs can be called within a LUW.
    You finish the current LUW by calling the BAPIs "BAPI_PS_PRECOMMIT "
    and "BAPI_TRANSACTION_COMMIT", in that order.
    Afterwards, you can start a new LUW by calling up the individual BAPIs
    again.
    More than one project is used, for example, if
    You create or change more than one project
    You have changed a project and want to change a network to which WBS
    elements from a different project are assigned
    You want to change various networks to which WBS elements from
    different projects are assigned
    You create or change a WBS assignment in a network so that a WBS
    element from a second project is used
    WBS elements from different projects are already assigned to a network
    (note: this type of network can never be processed with the above
    mentioned network individual BAPIs)

    System Response

    The current individual BAPI is not executed.

    How to fix this error?

    You are probably using a self-developed report. In this case, notify
    the developer responsible for the report.
    The report may only use a maximum of one project per LUW! If required,
    the individual BAPI calls must be distributed between more than one
    LUW.

    Procedure for System Administrators


    Error message extract from SAP system. Copyright SAP SE.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CNIF_PI035 - More than one project is being used ?
    The SAP error message CNIF_PI035 ("More than one project is being used") typically occurs in the context of project management within SAP, particularly when dealing with project structures and assignments. This error indicates that the system has detected multiple projects being referenced in a context where only one is expected.
    
    Cause: Multiple Project Assignments: The error often arises when a transaction or operation is trying to reference multiple projects simultaneously. This can happen if: A cost center or internal order is assigned to more than one project. A network or activity is linked to multiple projects. There are inconsistencies in the project structure or hierarchy. Incorrect Data Entry: Users may inadvertently select multiple projects when only one is intended, leading to this error.
    Configuration Issues: There may be configuration settings in the project system that allow for multiple project references where it should be restricted.
    Solution: Check Project Assignments: Review the assignments of the cost centers, internal orders, or

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker