Do you have any question about this error?
Message type: E = Error
Message class: CN_ECP_PS -
Message number: 015
Message text: Project cost estimate creation failed
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN_ECP_PS015
- Project cost estimate creation failed ?The SAP error message CN_ECP_PS015, which indicates that "Project cost estimate creation failed," typically arises during the process of creating a cost estimate for a project in the Project System (PS) module. This error can be caused by various factors, and understanding the root cause is essential for resolving the issue.
Possible Causes:
- Missing Master Data: Required master data such as work breakdown structure (WBS) elements, activity types, or cost centers may be missing or incorrectly configured.
- Incorrect Settings: Configuration settings in the project system or controlling area may not be set up correctly.
- Budget Issues: The project may exceed the available budget, or there may be issues with budget availability checks.
- Authorization Issues: The user may not have the necessary authorizations to create a cost estimate.
- Technical Issues: There may be technical problems, such as system performance issues or database inconsistencies.
- Incomplete Data: Required fields in the cost estimate creation process may not be filled out completely.
Solutions:
- Check Master Data: Ensure that all necessary master data is available and correctly configured. Verify that WBS elements, cost centers, and activity types are set up properly.
- Review Configuration Settings: Check the configuration settings in the Project System and Controlling (CO) modules to ensure they are correct.
- Budget Availability Check: Review the budget for the project to ensure that it is sufficient and that there are no issues with budget availability.
- Authorization Check: Verify that the user has the necessary authorizations to create cost estimates. This may involve checking roles and permissions in the SAP system.
- Technical Support: If the issue persists, consider reaching out to your SAP Basis team or technical support for assistance with potential system or database issues.
- Data Completeness: Ensure that all required fields in the cost estimate creation screen are filled out correctly and completely.
Related Information:
If the error persists after checking these areas, it may be beneficial to consult with your SAP support team or a functional consultant specializing in the Project System module for further analysis and resolution.
Get instant SAP help. Start your 7-day free trial now.
CN_ECP_PS014
Project cost estimate cancellation failed
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN_ECP_PS013
Project cost estimate canceled
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN_ECP_PS016
Project not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN_ECP_PS017
Cost estimate item number &1 for WBS &2 not found
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
Click on this link to search all SAP messages.