How To Fix CN504 - Activity &1 &2: Value too big because of unit used


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 504

  • Message text: Activity &1 &2: Value too big because of unit used

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN504 - Activity &1 &2: Value too big because of unit used ?
    The SAP error message CN504 ("Activity &1 &2: Value too big because of unit used") typically occurs in the context of project management or controlling when the system encounters a value that exceeds the allowable limits for a given unit of measure. This can happen in various scenarios, such as when entering costs, quantities, or other numerical values related to activities or resources in a project.
    
    Cause: Unit of Measure: The value being entered is too large for the unit of measure defined for that activity or resource. For example, if the unit is in hours and the value exceeds the maximum limit defined in the system.
    Configuration Issues: The configuration settings for the project or activity may not be set up correctly, leading to discrepancies in expected values. Data Entry Errors: Users may inadvertently enter a value that is too large due to a misunderstanding of the unit of measure or a simple

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker