Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 453
Message text: Meilestone number &1 can no longer be changed in &2
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
CN453
- Meilestone number &1 can no longer be changed in &2 ?The SAP error message CN453 indicates that a milestone number (in this case, &1) cannot be changed in the specified object (in this case, &2). This error typically occurs in the context of project management or project systems (PS) within SAP, particularly when dealing with project milestones in a project structure.
Cause:
The error CN453 usually arises due to one of the following reasons:
- Milestone Status: The milestone may have already been completed or confirmed, which prevents any changes to its details.
- Project Structure: The milestone might be part of a project structure that has been locked or is in a status that does not allow changes.
- Authorization Issues: The user may not have the necessary authorizations to make changes to the milestone.
- Dependencies: There may be dependencies or relationships with other project elements that restrict changes to the milestone.
Solution:
To resolve the CN453 error, you can take the following steps:
- Check Milestone Status: Verify the status of the milestone. If it is completed or confirmed, you may need to reverse that status before making changes.
- Review Project Structure: Ensure that the project structure allows for changes. If the project is locked or in a specific status, you may need to unlock it or change its status.
- Authorization Check: Confirm that you have the necessary authorizations to modify the milestone. If not, contact your SAP administrator to obtain the required permissions.
- Dependencies Review: Investigate any dependencies or relationships that may be preventing changes. You may need to adjust related elements before modifying the milestone.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines related to milestones in your version of SAP.
Related Information:
By following these steps, you should be able to identify the cause of the CN453 error and implement a suitable solution.
Get instant SAP help. Start your 7-day free trial now.
CN452
Milestone & has not been created
What causes this issue? INCLUDE NA_ALLG_SYSTEM OBJECT DOKU ID TXSystem Response INCLUDE NA_ALLG_NOVERARBEITUNG OBJECT DOKU ID TXHow to fix this erro...
CN451
Long text could not be processed
What causes this issue? The long text could not be created, deleted, or changed, because an internal error has occurred.System Response INCLUDE ...
CN454
You must assign milestone & to an activity
What causes this issue? The milestone does not have a valid assignment to a network activity.Error message extract from SAP system. Copyright SAP SE....
CN455
Milestone belongs to a billing plan - cannot change assignments
What causes this issue? You cannot change the assignment of the milestone to an activity, because the milestone is assigned to a billing plan.System ...
Click on this link to search all SAP messages.