Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 290
Message text: You cannot transfer a bill of material with sub-items
The bill of material which you have selected contains sub-items which
are not valid for network processing.
In this situation, you cannot perform a single-level BOM explosion.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
Check your entry, and select a different bill of material, if necessary.
oder legen Sie fnr das Material eine entsprechende Stnckliste an.
Error message extract from SAP system. Copyright SAP SE.
CN290
- You cannot transfer a bill of material with sub-items ?The SAP error message CN290, which states "You cannot transfer a bill of material with sub-items," typically occurs when you are trying to transfer a Bill of Material (BOM) that contains sub-items or components that are not allowed in the context of the operation you are performing. This error is often encountered in the context of production planning or when working with BOMs in SAP.
Cause:
- Sub-items in BOM: The BOM you are trying to transfer includes sub-items or components that are not compatible with the transfer process. In SAP, certain operations may not support BOMs with sub-items.
- Configuration Issues: There may be configuration settings in the system that restrict the transfer of BOMs with sub-items.
- Data Integrity: The BOM data may not be correctly set up, leading to inconsistencies that trigger this error.
Solution:
- Check BOM Structure: Review the BOM structure to ensure that it does not contain any sub-items. If it does, consider restructuring the BOM to remove sub-items or convert them into main items if applicable.
- Use Standard BOMs: Ensure that you are using standard BOMs that do not include sub-items. If you need to include sub-items, consider creating separate BOMs for those components.
- Review Configuration: Check the configuration settings in the SAP system related to BOM transfers. Ensure that the settings allow for the transfer of BOMs without sub-items.
- Consult Documentation: Refer to SAP documentation or help resources for specific guidelines on BOM transfers and the limitations regarding sub-items.
- Error Logs: Check the error logs for additional details that may provide insight into why the error is occurring. This can help in diagnosing the issue more effectively.
- SAP Notes: Look for relevant SAP Notes that may address this specific error or provide patches or updates that could resolve the issue.
Related Information:
By following these steps, you should be able to resolve the CN290 error and successfully transfer your BOM without sub-items.
Get instant SAP help. Start your 7-day free trial now.
CN289
All inspected material components available for network &
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN288
Network type &1 plant &2: No checking rule maintained for activity
What causes this issue? A checking rule must be maintained in order to carry out a material availability check. However, no checking rule has been ma...
CN291
Check procurement parameters of the copied items
What causes this issue? You are copying bill of material items to a network.System Response To copy quickly without dialog queries, the BOM items ar...
CN292
Lacking material availability for network &
What causes this issue? Either there are no material components available for network &V1&, or you cannot check the availability of the mater...
Click on this link to search all SAP messages.