How To Fix CN148 - No unit costing exists for activity &


CN148 - Overview

  • Message type: E = Error

  • Message class: CN - Meldungen für Netzpläne

  • Message number: 148

  • Message text: No unit costing exists for activity &

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CN148 - No unit costing exists for activity & ?
    The SAP error message CN148 "No unit costing exists for activity &" typically occurs in the context of controlling and cost management within SAP, particularly when dealing with activity types and cost centers. This error indicates that the system cannot find a unit cost for a specific activity type that is being referenced in a transaction or process.
    
    Cause: Missing Costing Data: The most common cause is that the unit costing data for the specified activity type has not been maintained in the system. Incorrect Activity Type: The activity type being referenced may not be correctly defined or may not exist in the system. Cost Center Assignment: The activity type may not be assigned to the relevant cost center or may not be valid for the period in question.
    Configuration Issues: There may be configuration issues in the controlling module that prevent the system from retrieving the necessary costing information.
    Solution: Maintain Unit Costing: Go to the transaction

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker