Do you have any question about this error?
Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 082
Message text: Activity & is not assigned to a WBS element
You want to reallocate a component that has a WBS element account
assignment.
The target activity is not assigned to a WBS element. You can only
allocate a component with WBS account assignment to an activity with
WBS account assignment.
Choose a target activity with an assignment to a WBS element.
Error message extract from SAP system. Copyright SAP SE.
CN082
- Activity & is not assigned to a WBS element ?The SAP error message CN082 indicates that an activity is not assigned to a Work Breakdown Structure (WBS) element. This error typically occurs in project management scenarios within SAP, particularly when trying to perform actions related to project activities that require a valid WBS element assignment.
Cause:
- Missing Assignment: The activity you are trying to work with has not been assigned to any WBS element in the system.
- Incorrect Configuration: The project structure may not be set up correctly, or the activity may not be linked to the appropriate project.
- Data Entry Error: There may have been a mistake during data entry, leading to the activity not being associated with a WBS element.
- Project Status: The project or WBS element may be in a status that does not allow for new assignments or changes.
Solution:
Assign the Activity to a WBS Element:
- Navigate to the project management transaction (e.g., CJ20N or CJ02).
- Locate the activity that is causing the error.
- Ensure that the activity is assigned to the correct WBS element. You can do this by editing the activity and selecting the appropriate WBS element from the hierarchy.
Check Project Structure:
- Verify that the WBS element exists and is active.
- Ensure that the project structure is correctly defined and that all necessary elements are in place.
Review Activity Settings:
- Check the settings of the activity to ensure that it is configured correctly and that it meets all necessary criteria for assignment to a WBS element.
Consult with Project Manager:
- If you are unsure about the correct WBS element or the project structure, consult with the project manager or the person responsible for project planning.
System Configuration:
- If the issue persists, it may be necessary to check the system configuration or consult with your SAP Basis or technical team to ensure that there are no underlying issues affecting the project management module.
Related Information:
By following these steps, you should be able to resolve the CN082 error and successfully assign the activity to the appropriate WBS element.
Get instant SAP help. Start your 7-day free trial now.
CN081
WBS element & is not an account assignment element (check)
What causes this issue? You want to settle the costs for material components to a WBS element. However, the WBS element which you entered is not an &...
CN080
Status of WBS element & does not permit assignments
What causes this issue? You want to assign a WBS element. The WBS element has one of the following statuses: marked for deletion deleted technically ...
CN083
You cannot change the company code (see long text)
What causes this issue? Plant &V1& has the company code &V2&. If you change the plant the company code will change as well.System Res...
CN084
The order or network could not be saved
What causes this issue? You want to use an interface (for example a BAPI) to save an order or a network. However errors have ocurred that prohibit sa...
Click on this link to search all SAP messages.