Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 036
Message text: Network created with plant & of copied network
Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.
To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.
Unfortunately, there isn't any extra information in this error notice.
First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).
Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.
You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.
The SAP error message CN036 typically indicates that there is an issue with the network created in the Project System (PS) module, specifically related to the plant assignment of the network. The error message suggests that the network was created with a plant that is not valid or is not properly assigned.
Cause: Invalid Plant Assignment: The plant assigned to the network may not exist or may not be valid for the project. Copying Issues: If the network was copied from another network, the plant assignment may not have been updated correctly.
Configuration Issues: There may be configuration issues in the system that prevent the network from being created or processed correctly. Authorization Issues: The user may not have the necessary authorizations to create or modify networks in the specified plant.
Solution: Check Plant Assignment: Verify that the plant assigned to the network is valid and exists in the system. Ensure that the plant is active and properly configured
Get instant SAP help. Sign up for our Free Essentials Plan.
CN035 No activity with an assignment to a standard WBS exists
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN034 & is not a network
What causes this issue? '&V1&' is not a valid network number.System Response INCLUDE 'NA_ALLG_NOVERARBEITUNG' OBJECT DOK...
CN037 Network type & is not same as & in copied network
What causes this issue? The network type of the network that you want to copy from is different from the network type which you have entered.System R...
CN038 You can only choose selected objects together with activities
What causes this issue? In the object selection for creating a network by copying, you have not marked <LS>activities</> but have selecte...
Click on this link to search all SAP messages.