Message type: E = Error
Message class: CN - Meldungen für Netzpläne
Message number: 024
Message text: No control parameters for scheduling exist
You have not maintained any controlling parameters for scheduling.
Consequently you cannot carry out scheduling.
INCLUDE 'NA_ALLG_NOFUNKTION' OBJECT DOKU ID TX
INCLUDE 'NA_ALLG_VORGEHEN' OBJECT DOKU ID TX
Enter the parameters for scheduling in Customizing for the Project
System.
Error message extract from SAP system. Copyright SAP SE.
CN024
- No control parameters for scheduling exist ?The SAP error message CN024 ("No control parameters for scheduling exist") typically occurs in the context of project management and scheduling within the SAP system, particularly when working with network activities in Project System (PS) or when trying to perform scheduling for a project.
Cause:
The error message CN024 can be triggered by several factors, including:
Missing Control Parameters: The scheduling control parameters for the project or network are not defined. This can happen if the project was created without specifying the necessary scheduling parameters.
Incorrect Project Settings: The project or network might not have been set up correctly, leading to missing or incorrect data in the relevant fields.
Configuration Issues: There may be issues with the configuration settings in the SAP system that prevent the scheduling parameters from being recognized.
Authorization Issues: Sometimes, the user may not have the necessary authorizations to access or modify the scheduling parameters.
Solution:
To resolve the CN024 error, you can take the following steps:
Check Control Parameters:
- Go to the project or network in question and check the control parameters. Ensure that all necessary scheduling parameters are defined.
- You can do this by navigating to the project or network in the SAP GUI and checking the "Scheduling" tab or section.
Define Control Parameters:
- If the control parameters are missing, you may need to define them. This can typically be done in the project definition or network definition screen.
- Ensure that the "Scheduling" settings are correctly filled out, including start and finish dates, duration, and any other relevant fields.
Review Project Settings:
- Verify that the project or network is set up correctly. Check for any inconsistencies or missing data that could affect scheduling.
Check Configuration:
- If you have access to the configuration settings, review the settings related to project scheduling in the SPRO transaction. Ensure that the necessary configurations are in place.
Authorization Check:
- Ensure that you have the necessary authorizations to view and modify the scheduling parameters. If not, contact your SAP security administrator.
Consult Documentation:
- Refer to SAP documentation or help resources for additional guidance on scheduling parameters and project management.
Related Information:
CJ20N
(Project Builder) or CN21
(Create Network) to access project and network details.By following these steps, you should be able to identify and resolve the cause of the CN024 error in your SAP system.
Get instant SAP help. Start your 7-day free trial now.
CN023
You cannot delete. Activity "&" has been replaced by a subnetwork
What causes this issue? Activity &V1& in the network has been replaced by a subnetwork. You cannot delete the activity.System Response INCLU...
CN022
Subnetwork number is identical to network number
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN025
Network does not contain activities
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...
CN026
No elements for activity & exist
Self-Explanatory Message Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of...