How To Fix CMM_ORTH_MATURE002 - Maturity key date is before period start date


CMM_ORTH_MATURE002 - Overview

  • Message type: E = Error

  • Message class: CMM_ORTH_MATURE - Messages for Orthodoxy Maturity Selection Routine

  • Message number: 002

  • Message text: Maturity key date is before period start date

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


CMM_ORTH_MATURE002 - Details

  • The SAP error message CMM_ORTH_MATURE002 indicates that the maturity key date you are trying to use is set before the start date of the period you are working with. This typically occurs in the context of managing maturity profiles or schedules in SAP, particularly in the context of financial or project management modules.
    
    Cause: Maturity Key Date: The maturity key date is the date on which a certain maturity profile or schedule is evaluated. If this date is earlier than the start date of the period you are analyzing, SAP will throw this error. Period Configuration: The configuration of the periods in your system may not align with the maturity key date you are trying to use. Data Entry Error: There may have been an error in data entry where the maturity key date was incorrectly set.
    Solution: Check Dates: Verify the maturity key date you are using. Ensure that it is set to a date

    Already have an account? Login here!




Instant HelpGet instant SAP help. Sign up for our Free Essentials Plan.


CMM_ORTH_MATURE002 - Related SAP Errors

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker