How To Fix CM_SDM_API029 - Material &1 is not planned in the net requirements segment


SAP Error Message - Details

  • Message type: E = Error

  • Message class: CM_SDM_API - Messages of HANA DB 2 ABAP mapping service

  • Message number: 029

  • Message text: Material &1 is not planned in the net requirements segment

  • Show details Hide details


  • Self-Explanatory Message

    Since SAP believes that this specific error message is 'self-explanatory,' no more information has been given.The majority of messages in the SAP system have a message text, however this is frequently insufficient to comprehend or resolve the problem.

    To make things easier, more detailed information is frequently added to describe the issue, how to fix it, and the necessary steps or configuration modifications.

    Unfortunately, there isn't any extra information in this error notice.



    What else can you do?

    First, use our AnswerBot below to get a possible cause and solution (requires a premium subscription).

    Also, review the in-depth Common Questions & Answers listed below; you could discover a solution there or be able to connect with others who have faced similar challenges.

    You can also try searching the SAP support portal (support.sap.com) but you need a special user ID to access it. It is possible that an SAP support note exists that provides additional details about the mistake or even steps for fixing it.


Smart SAP Assistant

  • What is the cause and solution for SAP error message CM_SDM_API029 - Material &1 is not planned in the net requirements segment ?

    The SAP error message CM_SDM_API029 indicates that a specific material (denoted by &1) is not planned in the net requirements segment. This typically occurs in the context of materials management and production planning within SAP, particularly when using the Supply Chain Management (SCM) or Advanced Planning and Optimization (APO) modules.

    Cause:

    1. Material Not Planned: The material in question has not been included in the planning run. This could be due to various reasons, such as:

      • The material is not set up for planning in the material master.
      • The planning parameters for the material are not correctly configured.
      • The material is marked as "not relevant for planning" in the system.
    2. Planning Version Issues: The planning version being used may not include the material, or the material may be excluded from the current planning version.

    3. Data Issues: There may be missing or incorrect data in the master data or transaction data that prevents the material from being planned.

    4. Time Period: The planning horizon may not cover the time period for which the material is being requested.

    Solution:

    1. Check Material Master:

      • Go to the material master record (transaction code MM03) and verify that the material is set up for planning. Check the MRP (Material Requirements Planning) views to ensure that the planning parameters are correctly configured.
    2. Review Planning Parameters:

      • Ensure that the material is not marked as "not relevant for planning" and that the appropriate MRP type is assigned.
    3. Check Planning Version:

      • Verify that the planning version being used includes the material. You can check this in the planning book or by using transaction code /SAPAPO/SDP94.
    4. Run Planning:

      • If the material is newly created or recently changed, ensure that a planning run has been executed. You can run the planning process using transaction code /SAPAPO/MC90 or similar.
    5. Review Time Period:

      • Ensure that the planning horizon covers the required time frame for the material. Adjust the planning parameters if necessary.
    6. Consult Logs:

      • Check the logs for the planning run to identify any additional errors or warnings that may provide more context on why the material is not being planned.

    Related Information:

    • Transaction Codes: Familiarize yourself with relevant transaction codes such as MM03 (Material Master), /SAPAPO/SDP94 (Planning Book), and /SAPAPO/MC90 (Planning Run).
    • MRP Types: Understand the different MRP types (e.g., PD, VB, etc.) and their implications on planning.
    • Planning Books and Data Views: Learn about planning books and how to configure them to include the necessary materials.
    • SAP Notes: Check SAP Notes for any known issues or patches related to this error message.

    If the issue persists after following these steps, it may be beneficial to consult with your SAP support team or refer to SAP documentation for further troubleshooting.

    • Do you have any question about this error?


      Upgrade now to chat with this error.


Instant HelpGet instant SAP help. Start your 7-day free trial now.


Related SAP Error Messages

Click the links below to see the following related messages:

Click on this link to search all SAP messages.


Rating
ERPlingo's SAP support assistant is amazing. Saves me countless hours trying to solve complex SAP issues myself. It's a real game changer!
Rate 1
Thomas Michael
SAP Consultant, Author & Speaker